My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12815 19TH AVE SE 2018-01-02 MF Import
>
Address Records
>
19TH AVE SE
>
12815
>
12815 19TH AVE SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 2:11:01 PM
Creation date
4/2/2017 2:24:33 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
12815
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />2716 C.IbY A,c.w <br />© Imi Use p: ,en425.2 WA 78201 <br />SHOCKEY a""mentnlAnaysu r;4z5.x5n.7)oe Celebrating over 33years ojexnl[ence! <br />PLANN ING GROUP. Inc. Permitting f 425.259.4448 <br />Public Miq <br />�ahxkgplanning.win <br />Everett School District No. 2 <br />Silver Lake Elementary School Portable Placement <br />Special Property Use Project Description and Narrative Criteria <br />April 15, 2015 <br />Project Description <br />Silver Lake Elementary School is an existing school that serves approximately 539 <br />students and 57 staff members in the Everett School District. The request is for a <br />Special Property Use Permit approval to allow the placement of six portable <br />classrooms and one restroom portable on a playfield directly adjacent to two existing <br />portable classrooms, located east of an existing covered play shed. (See Figure 1 — <br />Site Plans.) <br />The proposed portable classrooms are 896 SF each and the restroom portable is 492 <br />SF. The portable buildings are proposed to be placed on temporary footings on a <br />gravel base. The portable buildings will be accessed by a pre -manufactured ramp <br />and walkway system. The restroom portable will be served by an existing sewer line <br />and pump which was installed to serve portables previously situated in this location. <br />Power will b,� delivered from an existing pole mounted transformer, also installed to <br />serve the previous portables. <br />Up to 175 CY of soil will be removed and replaced with gravel (6 inches of soil will <br />be removed and 9 inches of crushed rock will be in the location under each portable <br />and associated ramps). The total roof area is 5,868 SF. The welcome ramp system is <br />pervious and no asphalt or other impervious surface is proposed. <br />This project is necessitated by dramatically increasing enrollment demands in the <br />south end of the Everett School District. On March 24k 2015 the Everett School <br />Board approved a boundary line adjustment shifting 139 •tudents from Woodside <br />Elementary to Silver Lake Elementary. The student population which is being <br />shifted to Silver Lake Elementary School actually resides closer to Silver Lake <br />Elementary School than to Woodside Elementary School. The Board's decision was <br />based on a series of community meetings. Without a boundary line adjustment, the <br />projected enrollment at Woodside Elementary School for the 2015-2016 school year <br />would have been 834 children. Woodside was designed to house 540 students and <br />currently has 10 portable classrooms and one restroom portable on site. <br />Project Narrative and SP11 Criteria (o © SHOCKEY <br />Everett School District No. 2 —Silver lake Elementary School Portables PLANN1Nf. CROUP.Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.