My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12815 19TH AVE SE 2018-01-02 MF Import
>
Address Records
>
19TH AVE SE
>
12815
>
12815 19TH AVE SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/21/2022 2:11:01 PM
Creation date
4/2/2017 2:24:33 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
12815
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
428
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.•• PUBLIC WORKS PERMIT Date: 5/26/2015 <br />Public Works Permit #: PWII505-042 <br />t' City of Everett Public Works Department 3200 Cedar Street Building Permit #; C1503-021 <br />Everett, WA 98201 � Planning Reference #: <br />(425) 257-8810 <br />Public Works Fee $: $ 240.00 <br />Other $: <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />EVERETT SCHOOL DIST 2 ' <br />4730 COLBY AVE <br />EVERETT WA 98203 <br />PHONE: 4253854195 PHONE: <br />TAX PARCEL ID # 28052900303400 SITE ADDRESS: 12815 19TFI AVE SE #P5 <br />DESCRIPTION OF PROPOSED WORK: }� <br />PW FOR NEW CLASSROOM PORTABLE -SILVER LAKE ELV9 <br />SAME SET OF PLANS FOR 61503-029 THRU B1503-034, C1503-0Y <br />PERMIT CONDITIONS / --/, , /� <br />1. All calls for inspection shall be made 24 hours in advance(fj� <br />2. All work shall be performed in accordance with the permit a curr "y of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUM 11 //I f �(�//� <br />4. The City concurs with the proposed stormwater management strategy of infiltrating/detaining runo fresh tPoer ct <br />portables in a gravel zone bei,eath the portables. Any overflows from these gravel areas must be directed to the ) <br />site's existing storm drainage system — either to the piped system located just to the north of the proposed <br />portables, or directly to the bioswale located north and east of the portables — as opposed to being allowed to sheet <br />flow directly north and into adjacent properties. A shallow Swale or low berm would suffice to direct any overflows to <br />the desired location. <br />5.Soils in the Type II planting area to the north of the project must be amended in compliance with City BMP 12-20. <br />Post -Construction Soil Quality and Depth, in Volume III of the City's 2010 Stormwater Management Manual. <br />6. City Streets are to be kept clean at all times. <br />7. Provide any necessary erosion control as directed by the Public Works Inspector <br />8. Work to be done per plan approved by Public Works dated 5-26-15. <br />Erosion control $200 <br />Plan Review $20 <br />Inspection $ 20 <br />FlAoilipj <br />Q'r I IS <br />%// 15 <br />Approved for Construction ate <br />FINAL INSPECTION Date <br />Approved as Constructed <br />'I ric�U[LIf�1 JUN 1 6 2015 <br />`clu. rice: <br />ACKNOWLEDGEMENT OF CONDITIONS <br />The undersigned ownerlapplicant hereby agrees to hold and <br />save harmless the City of Everett from any and all claims for <br />damages, costs, expenses, or causes of action that may arise <br />because of installation and maintenance of the improvement <br />or other right-of-way use hereto applied for and further agrees <br />to remove same upon notice from the City and to replace <br />public property damaged thereby. , <br />WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS kF DATE <br />PURSUED TO COMPLETION. THIS PERMIT MAY BE CANCELLED BY THE CITY U 0N-At <br />'O AND THEREAFTER IS TO BE DILIGENTLY <br />WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />W <br />
The URL can be used to link to this page
Your browser does not support the video tag.