My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12906 19TH AVE SE FRED MEYER FUELING STATION 2018-01-02 MF Import
>
Address Records
>
19TH AVE SE
>
12906
>
FRED MEYER FUELING STATION
>
12906 19TH AVE SE FRED MEYER FUELING STATION 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2021 2:52:16 PM
Creation date
4/2/2017 2:38:04 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
12906
Tenant Name
FRED MEYER FUELING STATION
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Report 6 June 27. 2008 <br />rred dleper Fueling Facility Project 92008-217 <br />Everettwn <br />For heavy truck traffic areas: 4 inches of AC over 12 inches of CRB; and <br />J% l,or general parking areas: 3 inches of AC over 9 inches of CRB. <br />The asphalt paving materials used should conform to the Washington State Department of <br />Transportation (WSDOT) specifications for Class B asphalt concrete and CRB surfacing. <br />Long-term pavement performance will depend on surface drainage. A poorly -drained <br />pavement section will be subject to premature failure as a result of surface water <br />infiltrating into the subgrade soils and reducing their supporting capability. <br />For optimum pavement performance, surface drainage gradients Of no less than two <br />percent are recommended. Also, some degree of longitudinal and transverse cracking of <br />the pavement surface should be expected over time. Regular maintenance should be <br />planned to seal cracks when they occur. <br />5.0 ADDITIONAL SERVICES <br />Riley is available to provide further geotechnical consultation as the project design <br />develops. We should review the final design and specifications in order to verify that <br />earthwork and foundation recommendations have been properly interpreted and <br />incorporated into project design and construction. <br />Riley is also available to provide geotechnical engineering and monitoring services during <br />construction. The integrity of the earthwork and construction depends on proper site <br />preparation and procedures. In addition, engineering decisions may have to be made in the <br />field in the event that variations in subsurface conditions become apparent. Construction <br />monitoring services are not part of this scope of work. If these services are desired, please <br />let us know and we will prepare a cost proposal. <br />6.0 LIMITATIONS <br />This report is the property of The Riley Group, Inc., Fred Meyer Stores, Inc., and their <br />designated agents and was prepared in accordance with generally accepted geolechnical <br />engineering practices. This report is intended for specific application to the Fred Meyer <br />Fueling Facility at 12906 Bothell-Iivercit Highway in Everett, Washington. This report <br />was prepared for the exclusive use of Fred Meyer Stores, Inc. and its authorized <br />representatives. It should be made available to prospective contractors for information or <br />factual data only and not as a warranty of ground conditions. No other warranty, expressed <br />or implied, is made. <br />The analyses and recommendations presented in this report are based upon data obtained <br />from the test borings drilled on -site. Variations in soil conditions can occur, the nature and <br />extent of which may not become evident until construction. If variations appear evident, <br />The Riley Group, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.