My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12906 19TH AVE SE FRED MEYER FUELING STATION 2018-01-02 MF Import
>
Address Records
>
19TH AVE SE
>
12906
>
FRED MEYER FUELING STATION
>
12906 19TH AVE SE FRED MEYER FUELING STATION 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2021 2:52:16 PM
Creation date
4/2/2017 2:38:04 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
12906
Tenant Name
FRED MEYER FUELING STATION
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C <br />Permit Services Division <br />City of Everett <br />Planning and Community Development <br />-2- <br />• C-I 2 <br />Site hnprovmnent Plan <br />• C-1.3 <br />Demolition and Erosion Control Plan <br />• C-1.4 <br />Grading and Storm Drainage Plan <br />• C-2.1 <br />Construction Notes and Details <br />• C-2.2 <br />Constrnction Notes and Details <br />October 8, 2008 <br />4) Three (3) sets of the following plans, details and specifications; detailing the architectural design <br />requirements for the fueling facility's canopy and kiosk, prepared by BCE staff, dated September <br />30.2008: <br />• A-1.0 Construction and Foundation Plans <br />• A-2.0 Exterior Elevations and Signage <br />• A-3.0 Yard Details <br />5) Three (3) sets of the following plans, details and specifications; detailing the structural elements <br />associated with the fuel facility's canopy, prepared by Lane Supply, Arlington Taxas: <br />• AEI Column, Footing and Foundation Details and Notes <br />• EI Canopy Layout, Notes and Specifications <br />• E2 Column and Fascia: Sections and Details <br />• E3 Engineering Details <br />G) Three (3) sets of the following plans, details and specifications; detailing the fuel storage, piping <br />and distribution system, prepared by ECE staff, dated September 30, 2008: <br />• T-1.0 <br />Underground "Tank and Piping Site Plan and Installation Notes <br />• T-2.0 <br />Tank and Piping Materials List (I of 2) <br />• T-2.1 <br />Tank and Piping Materials List (2 of 2) <br />• T-3.0 <br />20,000 Gallon Tank Plan and Section Installation Details <br />• T-3.1 <br />10,000/8,000 Gallon Tank Plan and Section Installation Details <br />• T-4.0 <br />Tank Slab, Anchoring and Miscellaneous Installation Details <br />• T-5.0 <br />"Tank Turbine/Fill Sump and Static Grounding Installation Details <br />• T-6.0 <br />Tank Turbine Suntp and Miscellaneous Installation Details (All Configurations) <br />• T-7.0 <br />Tank Pill Sump and Fitting Installation Details <br />• T-8.0 <br />Dispenser and Piping Installation Details Wayne Ovation 3-1-0 <br />• T-8.1 <br />Dispenser and Piping Installation Details Wayne Ovation 3-1-1 <br />• E-1 <br />Electrical Plans and Details <br />• E-2 <br />Electrical Plans and Details <br />• E-3 <br />Dispenser and Leak Detection Wiring Diagram <br />/�J <br />
The URL can be used to link to this page
Your browser does not support the video tag.