My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9509 19TH AVE SE 2018-01-02 MF Import
>
Address Records
>
19TH AVE SE
>
9509
>
9509 19TH AVE SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2021 10:00:49 AM
Creation date
4/2/2017 2:51:22 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9509
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
360
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />Cons tn _Jon Propd /ropress Report <br />IHE <br />CHURCHoi <br />Church Building Division <br />JESUS CHRIST 50 East North Temple Street <br />Salt Lake City. Utah 84150 <br />OF LATTER-DAY <br />Welnlsl Blenchox esi <br />SAINTS Everett 3rd _Ward ____.____. <br />p,.l.. <br />_ July_ 8,..1980 <br />Slake MISSgn <br />Everett Stake Center <br />ql.,d <br />Everett, Wa. <br />_ <br />- - -. - <br />_._ _verett,_--- -- — <br />Washington <br />Alcn - <br />erl e T �e[I <br />Dykeman, Ogden, Aldrid&e_4Quinton VaiofplrwUood 77 <br />- - <br />— <br />den <br />owers Building $ Construction fewrry Denton <br />_. <br />Work In 'Prowess - <br />bo SLnrdule TelMteralure Weather <br />[] Ye1 YdCNO <br />I <br />t <br />MASONRY - Contractor workin on tower. <br />CARPENTRY - Finishing Chapel roof sheathing. <br />Sheathing platform. <br />Framing Chapel light covers. <br />DRYWALL - Northeast wing. <br />MECHANICAL - Rough -in. <br />ROOFING - Cultural Hall roof. <br />OBSERVATIONS: <br />1. Paving in parking lot has been installed. <br />2. Catch basin at northeast corner of site full of eroded material. <br />Pipe now grouted. <br />3. Noted color differences in brick veneer especially east wall of <br />Relief Society Room. <br />4. Discussed resolution of pr+iblem of juncture of corridor ceilings near <br />drinking fountains - east foyers. <br />S. Observed tower construction. Block construction'not as detailed in <br />Structural Drawings. 8" 8 4" CMU substituted in lieu of 12" CMU <br />called for. Also noted lack of specified reinforcing lap and use of <br />brick mortar in block in lieu of CMU mortar as specified. In general <br />tower construction has been found to be totally unacceptable. <br />6. Corners along east wall behind platform were filled and finished <br />over the weekend. Architect's office was not notified as previously <br />requested and specified. Question has been raised about proper <br />resolution of previously documented problems. <br />7. Corners at north and south vertexes of Cultural hall were filled <br />over weekend. Architect's office was not notified as previously <br />requested and specified. Question has been raised about proper <br />resolution of problems previously documented. <br />the Iacl Inal an -------'' y pdrI1CUIJ1 wnd nd1 Oven InSpKiard Snell nor be CpMRlereo ■,lpiafllllr d Ihs srM nt of Slncl conlpll .UOV nil Uoi un mnih <br />SgneI JIC ale - - <br />MIf •CMaI C1Y..RY-Ar"n, llq rrk - yJ IIrV NM'IpM IyT MIe to W atl ""W.lER <br />rre N <br />r <br />
The URL can be used to link to this page
Your browser does not support the video tag.