My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9509 19TH AVE SE 2018-01-02 MF Import
>
Address Records
>
19TH AVE SE
>
9509
>
9509 19TH AVE SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/14/2021 10:00:49 AM
Creation date
4/2/2017 2:51:22 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9509
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
360
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I"iCHURCHoi <br />JESUS CHRIST <br />°F IATTEK DAY <br />SAINTS <br />Conetru n prof progreee Report <br />Church Building DIWr'ion <br />50 East North Temple Street <br />Salt Lake City. Utah B4150 <br />Everett. 3r_d _►hard------ -- - <br />Slaw M-S% n <br />Everett_ Stake Center-.- <br />Ev_eret_t____-- <br />- Type of Prolecl <br />July 10, 1980 <br />Everett, Wa. <br />____.Washington <br />A: nlril <br />Dykeman, <br />Ogden, <br />uiiiloti <br />nldridge._F�..4__—__ <br />I rairwood__ Z . <br />-Mel nl <br />`Bowers Building <br />f, Construction <br />Jerry Denton <br />WM% In ►ropeee <br />----- <br />------- <br />�-_ <br />TempN2lura <br />WeNner <br />do ecMJuk <br />Q yes <br />7(71fJo <br />PROBLEMS: <br />Visited Visited site at request of Jerry Denton to observe 12" CMU in tower <br />construction. Masonry Subcontractor has removed 4" $ 8" CMU down <br />to what was said to be 12" CMU. Upon further investigation with stone <br />hammer, mortar was chipped from top of exposed block surfaces and it <br />was found that 4" F, 8" CMU was in fact still in tower construction. <br />It was also noted that brick veneer mortar. (colored) was used in CMU <br />joints. <br />INSTRUCTIONS: <br />Continue to remove all non -conforming <br />that the use of colored mortar in the <br />is unacceptable. <br />A. Gary'O'Leary <br />Contract Administr ztor <br />construction in tower. Note <br />CMU portion of the tower construction <br />AGO/lv <br />cc: Church Building Division <br />Gene Berger <br />Bishop Todd <br />President. Fowler <br />Mowers Building $ Construction - Site <br />Bowers Buidling $ Construction - Salt Lake City <br />Tne lad that any partmular Wort has been :nspKa d no not b CW*xWea a vrener <br />$pnature <br />m.rt .. •umq Uwn.-HY Oea Ieet—r�. . :..,. erwrrw <br />110 M <br />IM ro luirti of SIMI compbance will' tlw conbacl IID..... , W, <br />rmmau mare w v; n...o •�s. <br />_,4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.