My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9900 19TH AVE SE 2018-01-02 MF Import
>
Address Records
>
19TH AVE SE
>
9900
>
9900 19TH AVE SE 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 12:22:14 PM
Creation date
4/2/2017 3:12:01 PM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
9900
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10'21,'87 15:a4 FAX 2082318782 BARGRALISEN E.VG $1002i004 <br />C'VIL ENGINEERING, L<NG RL NINri lUR WG. e:NVIRONMEWAL 6SRVK*8 <br />October 21, 1997 <br />Facsimile: (425) 257-8829 <br />Larry Crawford, Public Works Director <br />City of Everett <br />Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />RE: Home Hate - Everett, Washington <br />Our Job No. 5947 <br />Dear Larry: <br />As requested, this letter is to confirm that our office has reviewed the rough grading and temporary <br />erosion control plans prepared for the Iiome Rase project, and to the best of our knowledge, these plans <br />meet the requirements of the City of Everett Development Standards, as wc)) as the coadidoes of the <br />MDNS ismed by the City. We have also incorporated the additional plan review comments from you and <br />your Taff relative to maintaining erosion control and the required live storage volumes during the phased <br />grading operation. <br />As we have all discussed, it is likely that additional erosion control measures will be required by the <br />Contractor during the eonsuttetion phase because of the time of year the project is being eonsuucted and <br />due to the sensitive nature of the downstream wetlands and drainage system. Daily inspection and <br />maintenance of the erosion control measures will be required throughout the construction process to help <br />prevent and minimize erosion impacts from die pruIxt. A special now has bow provided on the pans <br />indicating that it is the contractor's responsibility to provide additional erosion contro', Wcasures as <br />required, and provide: daily inspections and maintenance of the system. <br />Please let me know if you have any questions or need any additional information regarding this issue. <br />Thank you for your assistarice and cooperation in processing the complex permits required for this project. <br />Sincerely, <br />I� K k t,, <br />Daniel K.Balmelli. P.E. 14 <br />Executive Vice President <br />DKB/sm <br />5947C.01I <br />CC: Dave Michaelis, Michacli"wenson Partners <br />Jim Houston, Construction Associates, Inc. <br />18216 72ND AVENUE SOUTH KENT, WA 98032 (4251251.6222 (4251 251-5782 FAX <br />10/21/97 15:3 N0.1491 P. <br />
The URL can be used to link to this page
Your browser does not support the video tag.