Laserfiche WebLink
Gordon Witcher <br />City of Everett <br />Building Department -2- October 21, 1997 <br />conditions, daily inspection and maintenance of the temporary erosion control measures will be <br />required by the contractor to help reduce and minimize the potential for impacts to the <br />downstream wetland and drainage system from erosion and sedimentation runoff. <br />Enclosed for your review and approval are three blueline prints of the rough grading and temporary erosion <br />control plans, and one set of reproducible mylars. Please let me know if you have any questions or need <br />any additional information for issuance of the grade and fill permit. Thank you for your assistance. <br />Sincerely, <br />i�a�lu t K <br />Daniel K. Balmelli, P.E. <br />Executive Vice President 16) <br />DKB/sm <br />59a7C.010 <br />enc: As Noted <br />cc: Steve Gale, Home Base <br />Larry Crawford, City of Everett Public Works Director <br />Jim Houston, Construction Associates <br />Dave Michaelis, Michaelis and Company <br />