Laserfiche WebLink
Larry Crawford, Public Works Director <br />City of Everett <br />Public Works Department -2- November 11, 1997 <br />of Ecology standards to allow clearing and grading of the site (luring the winter season. We have <br />incorporated special construction notes on the erosion control plans directing the contractor to complete <br />daily inspections and maintenance of the temporary erosion control measures and to provide additional <br />erosion control rwisures as required to help prevent erosion and discharge of silt -laden water off site. <br />Our office will continue to work with the City, the subconsultants, and the contractor throughout the <br />completion of the project to provide assistance and recommendations as needed. <br />Sincerely, <br />&,,&. <br />Daniel K. Balmelli, P.E. <br />Executive Vice President <br />DKB/sm/mv <br />5947C.013 <br />cc: Jim Housten, Construction Associates <br />Dave Michaelis, Michaelis & Company <br />