Laserfiche WebLink
Gordon Witcher <br />City of Everett <br />Public Works Department -2- November 26, 1997 <br />The enclosed revised storm drainage report indicates how we have adjusted the primary orifice sizes and <br />added secondary orifices so smaller storm events will impound the wetland compensation volume. The <br />wetland compensation calculation section of the report contains a summary page listing the required and <br />provided detention and wetland compensation volumes. <br />Please review these plans and calculations at your earliest convenience. Please call if you need any <br />additional information. <br />Gi. <br />Project Engineer <br />KWL/jss <br />5947C.014 <br />enc: As Noted <br />cc: Mary Keating, Construction Associates <br />Daniel K. Balmelli, Barghausen Consulting Engineers, Inc. <br />