Laserfiche WebLink
Addendum to Geotechnical Engineering Report for Everett Home Base <br />Proposed Wendy's at Everett Home Base <br />February 3, 1998 <br />NCA File No. 2134D98 <br />Page 3 <br />In general, it typically appeared that the design for Wendy's was somewhat more conservative than what <br />we recommended for Home Base. Accordingly, the Wendy's design is generally considered to conform <br />to our design recommendations. Specific geotechnical aspects we identified on the plans provided to us <br />are summarized below. <br />• Continuous strip footings for Wendy's are shown to be 20 inches wide, 24 inches deep, and designed <br />for an allowable bearing pressure of 2,000 pounds per square foot (pso. This is a greater width, <br />greater depth, and lesser bearing pressure than we recommended for Home Base. Therefore, <br />foundation design is considered to conform to our recommendations, as long as subgrade preparation <br />is done properly. <br />• The plans show perimeter footing drains, which agrees with our recommendations. <br />• The slab -on -grade detail generally conforms to our recommendations, with the exception that the <br />capillary break is only 4 inches thick, as compared to our recommended 6 inches thick. The greater <br />thickness of gravel would provide a more effective capillary break, especially considering the silty <br />nature of the till subgrade. In addition, it is probably more in line with typical construction <br />tolerances. <br />The Pavements sub -section in our report for Home Base addressed subgrade preparation, but not actual <br />design of the pavement section. For proper subgrade preparation, it is our opinion that a pavement <br />section consisting of 2 inches of asphalt concrete over 4 inches of 1-1/4-inch minus crushed rock base <br />course (Section 9-03.9(3) of the 1994 WSDOT/APWA Standard Specifications For Road, Bridge, and <br />Municipal Construction] should be adequate in areas of light traffic or parking for cars and small trucks. <br />In main entryways and areas subjected to heavy truck traffic, the pavement section should be increased <br />to 3 inches of asphalt concrete over 6 inches of crushed rock base. <br />We were not supplied with design geometry or loads for the pole -supported sign. However, we <br />understand that the structural engineer will likely design the pole foundation based on Uniform Building <br />Code (UBC) methods. We expect the soil at the sign location will be medium dense to dense silty sand, <br />which can be used as the soil type for the UBC design method. For these soil conditions, we would <br />recommend that design passive soil resistance be based on an equivalent fluid density of 250 pounds per <br />cubic foot (pcf). <br />NELSON-COUVRETTE & ASSOCIATES, INC. <br />