Laserfiche WebLink
GENERAL CONDITIONS FOR WASHINGTON STATE FACII TP CONSTRUCTION <br />TABLE OF CONTENTS <br />Part Page Part Page <br />PART I <br />GENERAL PROVISIONS <br />5.08 <br />Operations, Material Handling, <br />1.01 <br />Definitions <br />3 <br />and Storage Areas <br />17 <br />1.02 <br />Order of Precedence <br />4 <br />5.09 <br />Prior Notice of Excavation <br />18 <br />1.03 <br />Execution and Intent <br />4 <br />5.10 <br />Unforeseen Physical Conditions <br />18 <br />5.11 <br />Protection of Existing Structures, <br />PART 2 <br />INSURANCE AND BONDS <br />Equipment, Vegetation, Utilities, <br />2.01 <br />Contractor's Liability Insurance <br />6 <br />and Improvements <br />18 <br />2.02 <br />Coverage Limits <br />6 <br />5.12 <br />Layout of Work <br />19 <br />2.03 <br />Insurance Coverage Certificate; <br />6 <br />5.13 <br />Material and Equipment <br />19 <br />2.04 <br />Payment and Performance Bonds <br />6 <br />5.14 <br />Offshore Items <br />19 <br />2.05 <br />Adaitional Bond Security <br />7 <br />5.15 <br />Availability and Use of Utility <br />2.06 <br />Builder's Risk <br />7 <br />Services <br />19 <br />5.16 <br />Tests and Inspection <br />20 <br />PART 3 <br />TIME AND SCHEDULE <br />5.17 <br />Correction of Nonconforming <br />3.01 <br />Progress and Completion <br />8 <br />Work <br />20 <br />3.02 <br />Construction Schedule <br />8 <br />5.18 <br />Clean Up <br />21 <br />3.03 <br />Owner's Right to Suspend the <br />5.19 <br />Access to Work <br />21 <br />Work for Convenience <br />8 <br />5.20 <br />Other Contracts <br />22 <br />3.04 <br />Owner's Right to Stop the Work <br />5.21 <br />Subcontractors and Suppliers <br />22 <br />for Cause <br />9 <br />5.22 <br />Warranty of Construction <br />22 <br />3.05 <br />Delay <br />9 <br />5.23 <br />Indemnification <br />23 <br />3.06 <br />Notice to Owner of Labor <br />Disputes <br />10 <br />PART 6 <br />PAYMENTS AND COMPLETION <br />3.07 <br />Damages for Failure to Achieve <br />6.01 <br />Contract Sum <br />24 <br />Time!y Completion <br />10 <br />6.02 <br />Schedule of Values <br />24 <br />6.03 <br />Application for Payment <br />24 <br />PART 4 <br />SPECIFICATIONS, DRAWINGS, <br />6.04 <br />Progress Payments <br />25 <br />AND OTHER DOCUMENTS <br />6.05 <br />Payments Withheld <br />25 <br />4.01 <br />Discrepancies and Contract <br />6.06 <br />Retainage and Bond Claim <br />Document Review <br />11 <br />Rights <br />25 <br />4.02 <br />Project Record <br />11 <br />6.07 <br />Substantial Completion <br />25 <br />4.03 <br />Shop Drawings <br />it <br />6.08 <br />Prior Occupancy <br />26 <br />4.04 <br />Organization of Specifications <br />12 <br />6.09 <br />Final Completion, Acceptance, <br />4.05 <br />Ownership and Use of <br />and Pavment <br />26 <br />Drawings, Specifications, <br />and Other Documents <br />12 <br />PART 7 <br />CHANGES <br />7.01 <br />Changes in the Work <br />27 <br />PART 5 <br />PERFORMANCE <br />7.02 <br />Change in the Contract Sum <br />27 <br />5.01 <br />Contractor Control and <br />7.03 <br />Change in the Contract Time <br />32 <br />Supervision <br />14 <br />5.02 <br />Permits, Fees and Notices <br />14 <br />PART 8 <br />CLAIMS AND DISPUTE <br />5.03 <br />Patents and Rovalties <br />14 <br />RESOLUTION <br />5.04 <br />Prevailing Wages <br />15 <br />8.01 <br />Claims Procedure <br />35 <br />5.05 <br />Hours of Labor <br />15 <br />8.02 <br />Arbitration <br />36 <br />5.06 <br />Nondiscrimination <br />15 <br />8.03 <br />Claims Audits <br />36 <br />5.07 <br />Safety Precautions <br />16 <br />July 1, 1992 00700-page I <br />