Laserfiche WebLink
II-7-07 <br />Design Consultants P. <br />0. Box 1306 <br />Mukilteo, W A 98275 <br />425-745-6569-(0) <br />425-348-8229-(0) <br />Jeff Heilman <br />City of Everett Engineering/Public <br />Services Dept. <br />Re: Project: Gilbert <br />Job Address: 4618 - 21 St Dr. W <br />Plan Check No: Co71O-015 <br />Response Letter to City letter dated 10-29-07 <br />1. Corrected, see sheet # 1. <br />2. Corrected, see sheet #2 & 5. <br />3. Corrected, see sheet #3. Using existing floor framing. <br />4. See sheet, existing foundation. <br />5. Corrected, see sheet # 1. <br />6. Corrected, see sheet # 1. <br />7. Corrected, see sheet #4. Where R-30 is used with 2x8's use a netting or an <br />approved manufactures insulation method. The cantilevered areas shall be <br />boxed down to allow R-30 batts to fit. <br />Sincerely, <br />9 <br />Charles C Lee <br />