Laserfiche WebLink
Dr. C0710-015 <br />October 31, 2007 <br />Page 2 <br />7. Insulation in the floor of a cantilever shall be in contact with the heated surface (see <br />cantilever detail on Sheet 4). R30 insulation is required at the floor (will not fit in 2 x <br />8 joists). <br />Please prepare a response letter showing where each item in this correction <br />letter is addressed on the plan set. <br />Upon resubmittal of the drawings, your application will be given priority and plan review will <br />recommence. <br />All required submittals shall be of sufficient detail and contain sufficient information to ensure <br />that the proposed structure will be constn(cted in compliance with all adopted codes. <br />Sincerely, <br />Jeff Ileiln an <br />Development Technician <br />O[UI/PLNCKMSTRIIIULMANIC07IM15(4618-21"OR%) 1 (i <br />