Laserfiche WebLink
1I�NSELL � <br />Cun�truetion ��•rvf�•e�. In�•• <br />21 Grand estimate (cont) <br />c <br />17. Re-install downspouts, euterior lights, vents, numbers, etc. <br />1 S. Remove construction tarp'ng and scaffolding. <br />19. General clean-up each day and removal of all r,onstruction debris from site. <br />Total Cost: 5750,626.QOplus WSST <br />Exclusions: <br />1. WSST <br />2. Permits <br />3. Structural rot as noted. <br />4. Removing and re-setting of window biinds. <br />5. T�imming of trees to allow access to complete work. Primarily along the east side of building. <br />Thank you, <br />Kirk Hansell <br />Hansell Construction Services <br />Zz <br />