My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1420 21ST ST 2016-01-01 MF Import
>
Address Records
>
21ST ST
>
1420
>
1420 21ST ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 7:37:41 PM
Creation date
4/2/2017 4:26:59 PM
Metadata
Fields
Template:
Address Document
Street Name
21ST ST
Street Number
1420
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f� <br />`' E'�!C � TT <br />PUBLIC WORKS PERMIT <br />City of Everett Public Works Department <br />3200 Cedar Street <br />Everett, WA 98201 <br />(425)257-8810 <br />Date: 9/8/2006 <br />Public Works Permit #: PW0809-004 <br />Buildinp Permit #; C0808-005 <br />Planninp Reference #: <br />Public Works Fee $: $ 0.00 <br />Other $: <br />OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br />HARDING EBONY <br />2102 HOYT AVE <br />EVERETT WA 98201 <br />PHONE: 4253031385 PHONE: <br />TAX PARCEL ID # 00437043303100 SITE ADDRESS: 142 , 1 T ST <br />DESCRIPTION OF PROPO5ED WORK: St� <br />LIVING ROOM ADDITION/DECK C `sFA �� � <br />MATERIAL TO PJIATCH SIMILARLY AS EXISTING DWELLING (NET) � ` <br />A�, p�, <br />8. �' <br />hii�� S�,G'/I � ' � � <br />h-• i; . <br />PERMIT GONDI I IONS <br />1. All calls for inspection shall be made 24 hours in advance. <br />2. All work shall be performed in accordance with the permit and current City of Everett Design and Construction Standards <br />and Specifications. <br />3. Call Localion Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br />4. Connect side sewer per City Standard #'s 601, 602, 604. <br />5. Connect all rooftop downspouts to the side sewer. <br />6. The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to beginning <br />the project. <br />7. Install ero;ion control measures as delermined by the Public Works inspector, such as sill fence, straw bales, <br />swales, or erosion blankets. <br />8. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br />9. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, permitted site. <br />No wasting of material is allowed on this building lot. <br />10. No dirt, mud, rocks or debris to be tracked onto roadway. <br />11. No building materials lo be stacked on roadw•ay and roadway to be kept clean and open for pedestrian travel <br />12. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan #'s 305A & 306 on this <br />proposal's frontage as directed by the Public Works Inspector (i.e. all unused driveways and any broken or <br />damaged area must be replaced ). <br />FOR PUBLIC WORKS INSPECTION, CALL RANDY ALLEN AT 425-339-7403 <br />, : � � ��'a:? �'j �!t � �c- - � �) - I ( ACKNOWLEDGEMENT OF CONDITIONS <br />"- ��� ------ ' The undersigned owner/applicant hereby ayrees to hold and <br />save harmless lhe City of Everetl (rom any and al� claims (or <br />damages, costs, expenses, or causes of aclion that may arise <br />� because o( inslallation and mainlenance of the improvement <br />)'; �. �, � i .� �., r ��/G� or olher right-of-way use herelo applied for and further agrees <br />A roved fo� Construction Date lo remove same upon notice from ihe City and to replace <br />pp public property damaged thereby. <br />r - ., 1 <br />�1���E9� ���71�71C' I�I> r��s'� �7�"`� �('d77-� , � <br />FINAL INSPECTION Date � ��"� ( �'' v ���`�"�"�`''' L- `� �� <br />A roved as Constructed �%'�S�Er�� � �—� <br />pp Signa�ur 'Applicant l�Date <br />WORK AUTHORIZED BY TH75 PERI•IIT P1U5T BE STARTED WITHIN 160 DAYS OF DATE PERh71T IS ISSUED AND THEREAFZ'ER IS TO BE DILiGENTLY <br />PURSUED TO COt•1PLEfION. THIS PER�11T h1AY BE UNCELLED �Y THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.