Laserfiche WebLink
� ^ � � I <br /> Conclusion: N/A <br /> 7. Does the proposed development result in a mix of permitted residential and <br /> commercial uses allowed by the zoning in which the property is located which <br /> would not result from compliance with the development standards and/or <br /> design guidelines proposed to be modified. <br /> Finding: The proposal is for residential uses only. <br /> Conclusion: N/A <br /> S. Does the proposed design mitigate the impacts that could be caused by � <br /> retaxation of the standards which are proposed to be modifted. { <br /> Findin : The proposed design will create more useable open space on site, and ! <br /> allow for increased separation between structures. The setback that will be reduced ; <br /> wili be landscaped, and designed tr� preserve privacy from the adjoin:ng properties. ' <br /> Conclusion: The centrally located open space area, as well as the connection to � <br /> the open space area on the southern property line lends to a better site layout. <br /> DECISION: The proposal is approved as submitted subject to compliance with all city, ' <br /> state and federal regulations. The following conditions shall apply: . <br /> 1. Access - O.K. as shown on the site plan reviewed. � <br /> 2. Premise Identification Easements -The correct address of each residence <br /> served by the easement access road must be posted upon a permanent sign at <br /> the street entry to the easement access. In addition, the correct address must be � <br /> posted upon or near eacf� residence in such a manner as tr, oe clearly visible and � <br /> legible from the easement access road. <br /> 3. Signs - Signs stating 'NO PARKING - FIRE LANE - TOW AWAY ZONE' shall be <br /> provided the length of the easement access. Locations are to be approved by <br /> the Fire Marshal. � <br /> 4. A fire hydrant is required within 200 driving feet, but not closer than 50 feet, of <br /> every structure. Locatio� of the hydrant(s) shall be approved by the Fire <br /> Marshal. i <br /> 5. Fire Flow - Fire flow requirements for this structure are 1,750 gpm. <br /> 6. PREMISE IDENTIFICATION AND ALL REQUIRED FIRE DEPARTMEhT <br /> ACCESS ROADS AND FIRE HYDRANTS SHALL BE IN SERVICE PRIOR TO <br /> COMMENCEMENT OF CONSTRUCTION. j <br /> a <br /> �6 <br />