My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/12/17 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/12/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2017 11:22:25 AM
Creation date
4/3/2017 11:21:49 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/17/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSTRUCTION BUDGET AND ENGINEERING ESTIMATE <br /> GEOTECHNICAL ENGINEERING AND FIELD OBSERVATIONS <br /> Labor <br /> Engineering <br /> a. Provide 95 percent design submittal including conversion to 5,500 <br /> WSDOT Specification format. <br /> b. Attend additional design meetings 1,500 <br /> c. Prepare 3 Easement Exhibits according to City Standards. 2,800 <br /> d. Attend preconstruction meeting. 350 <br /> e. Review shop drawings and other technical submittals. (Assumes up <br /> to 12 hours of engineering review time and office administration 1,900 <br /> support). <br /> f. Prepare Record Drawings of the project based upon the construction <br /> records of the Contractor and City's &GeoEngineers' on-site 3,900 <br /> representations. Submit one set of Mylar record drawing and <br /> electronic copy according to City AutoCAD Standards. <br /> Site Meetings, Coordination, Scheduling <br /> Includes up to 3 site meetings,internal scheduling,coordination of field $ 1,500 <br /> staff <br /> Observe Pile Driving on a Full-Time Basis <br /> Staff Engineer(assume 5 days with 9 hours on site each day of pile 5,040 <br /> driving activity) <br /> Observe Permeation Grouting on a Full-Time Basis <br /> Staff Engineer(assume 5 days with 9 hours on site each day of 5,040 <br /> __permeation grouting activity) _— —— — — �— — _________ _ <br /> Project Manager Site Visits <br /> Project Manager(assume 3 site visits at 1'/2 hr/visit) (if required) 765 <br /> Project Management& Consultation <br /> Principal / Project Manager (assumes 12 hrs) (if required) 2,200 <br /> Project Assistant(assumes 12 hours) (if required) 900 <br /> Summary Letter(if requested) 1,200 <br /> ESTIMATED LABOR TOTAL $32,595 <br /> EXPENSES <br /> Travel(mileage) 175 <br /> Communications/copies and plan production 1,100 <br /> Field Equipment 150 <br /> ESTIMATED EXPENSES TOTAL $1,425 <br /> ESTIMATED TOTAL $34,020 <br /> P:\0\0661055\01\066105501 amendment 2.doc AMENDMENT NO. 2 43 <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.