Laserfiche WebLink
requested under this task and inform EPWD if funds in this task are insufficient to <br /> accomplish the requested work. This task does not include preparation of a complete <br /> permitting package in support of retrofitting the bridges or creating additional tidal <br /> channels; such an effort would be conducted under a separate scope of work. This task <br /> will only be conducted if authorized in writing by EPWD. <br /> • <br /> 2009 Year 2 Cost Estimate <br /> Estimated costs to complete the Year 2 monitoring tasks for the EPWD portion of the <br /> restoration site are $93,242, including$5,000 in unauthorized additional services funds <br /> which would have to be specifically authorized in order to be used. A per task <br /> breakdown of costs is shown in the attached table. Rates are confidential information <br /> between EPWD and ICF Jones & Stokes. ICF Jones & Stokes will track effort by task <br /> and will move funds between tasks as necessary to accomplish the scope of work. <br /> 7 <br /> Year 2 Monitoring Smith Island Restoration revised December 4,2008 <br />