My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008/12/17 Council Agenda Packet
>
Council Agenda Packets
>
2008
>
2008/12/17 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2017 11:22:25 AM
Creation date
4/3/2017 11:21:49 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
12/17/2008
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EVERETT CITY COUNCIL AGENDA ITEM COVER S IEET <br /> PROJECT TITLE: Consent COUNCIL BILL# <br /> Change Order No. 1 to the X Action Originating Department ENG/PS <br /> Everett Riverfront Surcharge First Reading Contact Person Dave Davis <br /> Project, Schedules A and B, Second Reading Phone Number 257-8913 <br /> with KLB Construction Inc. in Third Reading FOR AGENDA OF Dec. 17, 2008 <br /> the amount of$597,300. Public Hearing <br /> Initialed by: <br /> Department Head <br /> CAA <br /> Council President <br /> Location Preceding Action Attachments Department(s)Approval <br /> Everett Riverfront Area 5/21/08 Contract Award Change Order No. 1 Utilities <br /> 12/16/08 Budget <br /> Committee <br /> Amount Budgeted $11,578,521.22 <br /> Expenditure Required $9,631,354.56 Account Number(s): RD3310, RD3316 <br /> Budget Remaining $2,544,466.66 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> KLB Construction Inc. has physically completed construction of the Everett Riverfront Surcharge Project, <br /> Schedules A and B, within the 142 calendar days allowed by the contract. The contract requires that they <br /> continue to maintain the surcharge material until the second phase contract is awarded. <br /> Two contract bid items were exceeded during construction as a result of quantity overruns. The attached <br /> Change Order No.1 reflects an increase of materials used for two bid items and a total increase to the contract <br /> in the amount of$597,300. - <br /> RECOMMENDATION (Exact action requested of Council): <br /> Authorize the Mayor to sign Change Order No. 1 to the Everett Riverfront Surcharge Project, Schedules A <br /> and B, with KLB Construction Inc. in the amount of$597,300. <br /> C1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.