Laserfiche WebLink
0 <br />ENGINEERIN� <br />25udtn�ve Srnn�� <br />s��ao zao <br />ed��,o��ds. �vn �unzo <br />��� ir�nc: 425.779.t�soo <br />i ;« �;ts �rii.:,5�0 <br />FIELD OB�FRVATION <br />Project: Nelson Residence <br />Job No.: 07221.11 <br />Field Rep.: Julie Sandoz <br />Date of Observation: 11/17/08 <br />Location: 85�2 9'- e. SE Purpose of Site Visit: Pile <br />Everett, WA Ins ection <br />Client/Owner: Gla�k Nelso� General Contractor. Pacific Piling <br />, and Underpinning <br />ASSESSMENT REPORT <br />A site observation was performed on November 17'�', 2008 to veriiy the pin pile <br />refusal. <br />At the time of the observalion 2 of the 6 piles were installed. The conlraclor <br />installed the remaining 4 piles supporliny the house footing the following day <br />but a site visit was riot required. <br />The 2" dia. piles were tested for refusal using a 1401bs pneumatic hammer and <br />1 minute of sustained driving. The maximum allowable settlement in one <br />minute is 3/4". All tested piles met the design requirements of the approved <br />siructural plans. <br />Due to an interfering downspout drain line, lhe ►hree piles spaced at 6'6" were <br />increased to 6'11" and the northern most pile was relocated around the corner <br />of the house. The original design aliowed for piles to be spaced at a maximum <br />of 6'11". This change is acceptable with Ihe original design. <br />At the time of the observation all work was in conformance with the approved <br />structural plans. <br />DISCLAIMER <br />This obsen�alion was performed on ? 1/17I08 and is the professional opinion o( CG <br />Engineering PLLC based on the informalion available during lhis assessment or evaluation. <br />This report does not warrant or guarantee that all conditions were discovered al lhe lime ot <br />lhe observalion or evaluation. This report was prepared subject lo lhe slandard of care <br />applicable to professional services at the lime the services were provided. <br />