Laserfiche WebLink
. ( �; <br />Plan �:heck Nos. 60098 - 60104 <br />October 20, 1998 <br />Page 2 of 2 <br />/9. UBC Sections 1006.33.1 and 1005.3.3.5 indicate the requirement for one-hour doors at all <br />entries to units in the 6-plexes. Please add the reyuirementto plans. <br />10. Berms are indicated for the apparent purpose of classifying the 6-plexes as being two stories <br />and a basement. These berms are required to extend to five feet out from the building line <br />before sloping away. The maximum allowable slope shali be 2 horizonta( to 1 vertical <br />(UBC 208). Please revise elevations. <br />,/11. Please add attic access requirements per Section 1505.1. <br />� 12. Sections on Sheet WS-1 do not indicate a one-hour separation between units (Section <br />' 310.2.2). Please revise. <br />l 13. Under the energy notes, please indude the requirements for R-30 at floor over crawl space, <br />; U-factor of .40 maximum for winc�ows and 20 for doors. <br />V14. Please indicate that roof gutters will be connected ro the sto-m sewer. <br />15. Please revise all app(icable shearwall details to show compliance with footnote f/3 of UBC <br />Table 2311-1-1. NO-� �rJ��, ��-(i.�� �5 7 <br />Prepare a response letter showing where each item in this�correction letier is addressed on the plan <br />set. <br />Upon resubmittal of the drawings, your application will be given prioriry and plan review will <br />recommence. <br />All required submittals shall be of sufficient detail and contain sufficient information to ensure that <br />the proposed struct j�e will b constructed in compliance with all adopted codes. <br />Sincerely, � 1/ � � <br />Steve ivIifler, PE <br />Associate Engineer <br />SM:jWyc(ocrylck.l6) <br />