Laserfiche WebLink
PORT OF EVERE7�T SECTION OOS00 <br /> 1210 S"I'KC•LT �IARIN:� —A'OLU��fE 1: hL-V�ItiE �VOItK SUPPLE\dE\TAR�"CO�DITIONS <br /> SGO1 Supplemei�tarv Conditi��;�; <br /> Tlie following supplements shall modify, delete, and/o; add to the General Conditions or <br /> Instructions to Iiidders. Where any article, parneraph, or subparaeraph in the General <br /> Conditions is supplemented by one of the follo�i in�paraeraphs, the proeisions of such <br /> article, paraerarh, or subpara�aph shall remain in effect and the supplemental provisions <br /> shall be considered as added tl�ereta Wliere any artide, paragraph, or subparagraph in <br /> the Generzl Conditions is amended, voided, or superseded by any oFthe follo«•ing <br /> paraeraplis, Ihe provisions of such article, paragraph, or subpara3aph not so amended, <br /> voided, or superseded shall remain in effect. <br /> Tl�e supplements referenced within diis section are identihed �cith the same number and <br /> title used for that topic in [he Gener�l Conditions. <br /> SC-02 Liquidated Damaees <br /> In naming the prices for cempletion of die work witl�in the time specified it shall be <br /> understood and aereed the work shall be completed within that time. I£ however, said <br /> work is not complcted within the time named in the Contract, or as extendcd in <br /> accordance with Ariicle ]2 of the General Conditions, the PORT may deduct and retain <br /> as liquidated damagcs out of any sum then due or that may become due the <br /> CONTRACI�OR at time of such delinquency, or later, the sum as set forth in paraerapl� <br /> 3.2 of the Aereement Fenn for each and every calendar day that the date of substantial <br /> completion of tlie Contract is delayed. In submittin�a proposal and si�ing the Contract, <br /> the CONTRACTOR tliereby shall have a�eed to tl�ese provisions and; furthermore, that <br /> the sum dcductcd and retained is not a penalty but a reimbursement tu the PORT for <br /> damages �i�l�ich the PORT will have sustained Uy reason of such delayed completion. <br /> Damages so liquidated are understood to include the additional cost to thz PORT for <br /> engineering interest cl�arbes, o��erliend, and the like. <br /> Amount due the PORT fi�om the CONTRACTOR under the foregoing shall not in a�iy <br /> deeree rclease the CONTRACTOR from fu�ther obligations in respect to the fulfillment <br /> of tl�e entire contract, nor any ri��ht �chich the PORT may have to claim. sue ::, and <br />� recover compensation and damages fur nonperforn�ance or breach of the contract. <br /> SC-03 Rc._ °��orts of Investieations and Tests <br /> A. General: ]nforniation and da�a reflected in the Contract Documents wi[h respect <br /> to under�ound conditions and f�cilities at or conti�uous to die site is based upon <br /> infonnation and data fumished to the PORT and the ENGINEER by o�i•ners or <br /> such underetound facilities or others, and tlie PORT dues not assume <br /> resp��nsibility lor the accuracy or com�leteness thereof. <br /> OOS00 - 2 � <br /> 1 <br />