Laserfiche WebLink
� PORT OF Eb'ERETT SECTION OG800 <br /> , ]?T° S7'RL'GT �I.IRINA—�'OLU�[F, l: MARINE �VOItIC SUPPLEb4E\TARY CON�ITIOt�'S <br /> 1 <br /> � B. Subsurface Lifonnation: <br /> !1) Data on soi] and suUsurface conditions presented in the Specifications are <br /> a not to be taken as definitive but are hased on iimited available information <br /> � and the interpretation and opinions of the i,ivestigators; consequently, such <br /> data cannot Ue considered preci�e or comp]^te, and the PORT makes no <br /> � guarantee as to the completeness, accuracy, or precision of the data. <br /> (2) CONTRACTOR shall familiarize itself with available information on <br /> � subsurface conditions that could be exoected to affect the performance of <br /> ; the Work or its schedule and cost associated «�ith such performance. <br /> Reports of studies and investigations and other data obtained by, or on <br /> � beha]f of, PORT are available to CONTRACTOR for its use in developing <br /> an understanding suUsurface conditions. CONTRACTOR shall estimate <br /> the effect of known site conditions on die selection of eonstruction <br /> � equipment and methods, schedule, and costs of performin�the«ork <br /> under this Con[ract. <br /> � (3) The following geotechnical engineerino reports�i��re prepared for this <br /> X <br /> - project: <br /> � a. Puget 5ound Drcd�ed Disposal Analysis, Full Cl�aracterization for the <br /> I Z`� Street Marina, Pentec Environmental Pebruary 2001. <br /> � b. Final Geotechnical Engineering Study, 12`h Street Marina, Hart <br /> Crowser, December 2003. <br /> c. 1?'h Street Marina/North Marina Redeeelopment Geotecluiical Report, <br /> � PND, Inc., October '_'004. <br /> These reports may be viewed at the office o:die PORT. <br /> 1 (1) The information presented in die above docmnents depicts subsurface <br /> conditions at tl�e exploration locations at the time of exploration. These <br /> � diagrams are presented only for the convenience of die CONTR4CTOR, <br /> and their presentation does not reduce or in any way limit the <br /> CONTRACTOR's responsibilities noted else�vhere in this section a�id in <br /> i the Contract Documents. Entering into the Ageement shall be conclusive <br /> evidence that the CONTRACTOR has reviewed nvailable information on <br /> site conditions and is satisfied as to the nahire of the Work to be <br /> { perfoiTned, materials to be furnished, and tl�e requirements of the <br /> � Specifications. <br /> � If desired, CONTRACTOR may seek approval from the PORT tu make its own <br /> � subsurface investi�ations to satisfi� ilself of the site and subsurface conditions and <br /> to proaide infomiation for CONTRICTOR-fumished en�ineerin� and drawings. <br /> OOS00 - 3 <br />