My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
607 11TH ST 12TH ST MARINA 2016-01-01 MF Import
>
Address Records
>
11TH ST
>
607
>
12TH ST MARINA
>
607 11TH ST 12TH ST MARINA 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2017 2:52:09 PM
Creation date
4/4/2017 7:30:59 AM
Metadata
Fields
Template:
Address Document
Street Name
11TH ST
Street Number
607
Tenant Name
12TH ST MARINA
Notes
VOL 1 & 2 - UPLAND WORK PROJECT MANUAL & HALF SIZE PLANS APPROVED
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� PORT OF EVERETT SECTION 00800 <br /> ],rf� S"1'RL�I'b1:'�l'�Ii\'A—�'OLUb1E :: b4.AR.I�1C- �l''ORK SL7'PLE�tL-NIAP.Y COir�ITIONS <br /> � <br /> � SC-0( Contract "fime <br /> The Contract, in its entirety, sl�all be Substantially Completed on or before 2�� calendnr <br /> i days afrer Notice-to-Proceed is issued and shal] be Finally Compfete widiin 30 calendar <br /> � days of Sutstantial Completion. <br /> SC-07 CONTRACTOR's Mobilization <br /> i <br /> Mobilization consists of preconstruction expenses and costs of preparaton�work and <br /> f operations perfonned by the CONTRACTOR that are not defined as a part of a pnyment <br /> � item. <br /> � Payment for mobilization w�ill be madc on the following basis: <br /> � <br /> A. Forty (40) percent aRer completion of five (�) percent of the total contract a�nount <br /> � of other bid items have been earned. <br /> B. Eighty (80) percent after completiou of fifty (SOj percent of the total contract <br /> amount of other Uid items have been eamed. <br /> i C. One-hundred (100) percent after completion of all work on the project has Ueen <br /> earned, including cleanup and acceptance of the project by tl�e PORT. <br /> � SGOS L-numer�tion of Drawings and S�cifications <br /> I Pollowing are the drawings and specitications whici� form a part of the Contract <br /> Documents as defined under ARTICLL- 1 of the GENLRAL CONDITIONS: <br /> ' Number Titic <br /> i <br /> T1.0 Tifle Sheet <br /> i <br /> G1.1 Shect Index Volume 1 <br /> G1.2 Plan Volume and Area Key <br /> G1.3 General Symbols <br /> � G1.4 General Abbreviations <br /> i <br /> ' G1S Project Control Plan <br /> , G1.6 Project Survey S. Control <br />'I i G1.7 Project Control Plan <br /> G1.S North i�Iarina Redevelopment Site Topo�aphic Survey <br /> G1.9 North Ivlarina Redevelopment Site Topogsaphic Survey <br /> GI.10 North �4arina Redevelopment Site Topoeraphic Survey <br /> G 1.11 Hydrogrnpl�ic Survey of�Vest End Nloorage Area <br /> G1.1' Topo3aphic Survey of 12'h Street Basin <br /> G1.13 Topo«raphic Sun�ey of 10`h St Boat Launch <br /> G1.14 Site Geotechnical Exploration and Test Pile Plan <br /> i <br /> OOS00 - � <br />
The URL can be used to link to this page
Your browser does not support the video tag.