Laserfiche WebLink
PnRT OP EVERE7'T SECf10\ OOSUO <br /> I�'�° STRI�l;"T :A�I:V:1��:1—VOLLTDITI: A]:�R[\E �VORK S[;PPLC-\4L-V�"G�R.�' COVDI7'IOVS <br /> If sueh im�csticatiuns are conducted, thec sha(1 be coordinated with Ihe PORT. <br /> 1�hc results oFany such ineestieation� shall bc pro�•idcd to tlie POR7 as soon as <br /> possib]c. <br /> SC-04 Documents. Order of Prcccdencc <br /> These specifications, the dra�vings, gencral and supplemental conditions, and all <br /> supplementary documents arc essential parts of dre Contract, and a requirement occurring <br /> i» one is as binding as thou�li occurring in all. Thcy ;ire intonded to be complementary <br /> and to describe and provide fur a complete��•ork. <br /> In eases of conflict in tlie requirements and provision� as set out bv the C'ontruct, ihe <br /> specifications, or the drawings, such conYlict shall bc reconcilcd by the �cccptnnce of thc <br /> following order ofprecedence for the various Contract Documents. <br /> A. Contract, the documc��t beuring thc sienature of the PORT und die <br /> CONTRr1CTOR. <br /> B. Pennits <br /> C. Bid Proposal submittcd by CONTR4C�TOR. <br /> D. Addenda, iFissucd. <br /> r. Supplementary Conditions. <br /> P. Technical Specifications. <br /> G. Drawin�s. <br /> H. Instructions to Biddcrs. <br /> 1. General Conditio��s. <br /> Tlie appurent sileuce of the specifications aud dra���ings as to mry detailed or the <tpparent <br /> omission from them of a detailed desciiption cuncemin, any puint, sl�all be regardcd as <br /> meaning that oi�ly the best general practice is to prevai] and that only appro��ed material <br /> an� ���orl:m���ship of Grst qualit�� :ire to bc uscd. <br /> SC-0� Pcnnits <br /> :lrticle f.10 of the General Conditiotis is amendcd tu include the tollo�rin��: <br /> Thc PORT has applied for nnd obtained the Shoreline�ianasement SuUstantia] <br /> Development Pemiit from the City of E•verett, and the Hydraulic Projects Approval � <br /> Permit from the VVashingion Department of Fish and \�'ildlife. The Corps of Engineers <br /> Permit and the�Vater Quality Certification/CZA�t Consistency Determination from the � <br /> Department of Ecolo�y are still pending. Tl�e CONTItACTOR shall comply with nll <br />' conditions of these pemtits. Copies of all �iennits must be posted at the <br />'i CONTR4CTOR'S project field office. <br /> 00800 - -t <br />