My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
607 11TH ST 12TH ST MARINA 2016-01-01 MF Import
>
Address Records
>
11TH ST
>
607
>
12TH ST MARINA
>
607 11TH ST 12TH ST MARINA 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2017 2:52:09 PM
Creation date
4/4/2017 7:30:59 AM
Metadata
Fields
Template:
Address Document
Street Name
11TH ST
Street Number
607
Tenant Name
12TH ST MARINA
Notes
VOL 1 & 2 - UPLAND WORK PROJECT MANUAL & HALF SIZE PLANS APPROVED
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. i <br /> PORI'OF EVERLTT SEC i ION 00?00 <br /> l,T" S7ItEEl'�f:ARIA:��—VOLU�IE 1� ��L-AR[NE R'ORK GPNEIWL CONDITIOP;S <br /> 6.^_13 �lho YOItT���ill cooperoteµ�ith tl�e CONI7L4CTOR to aecomplish the. foreeoine actions and�cill <br /> render its assis!ance���here nppropn�te; however, the PORT shall ha��e the rieht, v:id�out pro��idin� <br /> additiona]compensation to the CONTRACTOR,to direct the CONTRAC7'OR to modify any of <br /> Aie foregoing actions«�hich the CONTRAC"IOR has�aken or plans to take,or to ocer7ule such <br /> actions, ro desi�nate tte entrances to be used as "primary"or"neuval" envances, and to take <br /> appropriate legal ac,ioa in order to protect the interests of the PORT and those of its tenants and <br /> other CONTKACTGRs. Tl�e foregoing ac[ions to be taken by the CONTR�CTOR are the <br /> CONTRAC'IOR's primary rr.sponsibility. Neither the failure of the PORT to request that the <br /> COA'TRArTOR ta6:e a spec:fic action nor the exercise by the PORT of iu rights under this <br /> paragraph shail modify or constiwre a delense to or�rai�•er of d�e oblieations imposed upon the <br /> COA'TIL4CTOR in this para;;raph. � <br /> C31.d Failure to take tLe ection des:ribed above or to comply with the directi��cs of the PORT shall bc <br /> considered a material breach of d�e Contract Documents. <br /> 6.21.5 If and to the extent that the CONT24CTOR fails to satisfy tl�e obiications imposed on it, the <br /> CONT2ACTOR shall be liable£or and de(end, indemnify and hold harmless the PORT, <br /> Commission, ENGINLER, and al]other officers,employees, and agents of the PORT&om all <br /> liability,claims,damages,]osses, and espenses(induding but not limited to,anomeys'and <br /> r.onsultants'fees aud od�er expenses of litigation or arbitration)broueht against the PORT b}�a <br /> �hird pany(includine, but not limited to, Icssees, tenants,CONTR4CTORs,cusromers, licensees <br /> and invite�s of the POKT) for injunetiee relief a for monetary losses caused by loss of use. lost <br /> revenue,or interference with the activities of the POKT or s-uch d�ird party. <br /> 6.21.6 7�he CONTRACTOR shall pay all attomeys' fees and expenses inwned by the PORT in <br /> estabGshing and enti�rcine the PORT's nghts under this paracraph, «�hetl�er or not suit was <br /> instiwted. <br /> (.22 Progress Schedulc <br /> G?2.1 PrompAy after tl�e a�vard of tl�e Contrac�, the CONTRACTOR shall prepare a Progress Sci�edule in <br /> a Corm satisfuctory to the ENGCNEER. Nithin ten days aher receipt issuance of the Notice of li <br /> Au•ard, the CONIR4CTOR sl�all submi�six(o)copies of[he Proerzss Schedule to d�e PORT. �� <br /> Failure of tlic CONTR4CTOR to submit a proposed Progress Schedule in a fom�satisfactory to <br /> die L-NGINEER witliin d�e allo���ed time will not constimte grounds for an extension of the <br /> Contract Time. <br /> (?'_.? Unless oth�ru�ise specified, the Progress Schedule;hall consist of a nenvork analysis of the Critical <br /> PatL Nlethod(CPb1)in arrow diagram form sl�owing an acti��ity description,cost,and duration(in <br /> calendar d�ys) for all significant design,manuCacturine,construction, and installation activities. <br /> i M activity list shall be induded witti each copy ot tl�e Progress Schedufe. <br /> Ci?_'3 \Vithin ten(10)da}'s after its receipt by d�e PORT, n��o(2) cepies of the Progress Schedule will be <br /> remmcd to the CONTRACTOR. These copizs«ill bz returned•Nidi comments, if any, Follawin� <br /> re��iew by d�e PORT. Review by die PORT of the proposzd Progress Sche 3ule shall not constitute <br /> a�approval of the CONTRACTOR's canstruction means,methods,sequences,or schzdule. <br /> (>.2�.4 The Proeress Schedule shall oudine the propased operations,tUe interretations of tlie carious <br /> operations, and the order of performance in sufficient detail that progress of tlte�Vork can be <br /> evaluated accurately at nny time during the perfonnance of the�\'ork. If abbreaiations are used in <br /> thz make-up of the Pro�ress Schedule,a]eeend shall be pro��ided to define all abbreviations. <br /> 00700-3�4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.