My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
607 11TH ST 12TH ST MARINA 2016-01-01 MF Import
>
Address Records
>
11TH ST
>
607
>
12TH ST MARINA
>
607 11TH ST 12TH ST MARINA 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2017 2:52:09 PM
Creation date
4/4/2017 7:30:59 AM
Metadata
Fields
Template:
Address Document
Street Name
11TH ST
Street Number
607
Tenant Name
12TH ST MARINA
Notes
VOL 1 & 2 - UPLAND WORK PROJECT MANUAL & HALF SIZE PLANS APPROVED
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
+ PORT 0:EVL-KETT SECTION 00700 <br /> 12T"STREET�f.412INA—VOLUI�IE 1:b1.ARINE�VORK GENERAL CONDITIONS <br /> � 6.22.5 If miles[one completions are required by the Contract Documents,dten those milesione;chall be <br /> � cleady defined on the Proeress Schedule. <br /> 1 <br /> 6.22.6 If abbreviations are used in[he makc•up of t6e Progress Schedule,a legend shall be provided to <br /> deCme all abbreviations. Should it become evident that the CONTRACTOR may fail to meet the <br /> � scheduled dntes as shown, the ENGINEER ma�require the CONTRA('TOR to submit a recovery <br /> schedule demonstrating its proposed plan[o make up lag in scheduled proeress and to ensur� <br /> completion of the work within the Con[ract Time."I�he CONTR�.CTOR shall,upon tequest,be <br /> � required at CONTRACTOR's oam expense to submit a revised Progress Schedule and to increase <br /> CON7'RACTOR's work force and working houn(second and third shifu)as required to bring the <br /> acmat completion dates of tl�e activitie,into confortnance«ith the Progress �chedule. Further, <br /> � CONTR4CTOR shall submit a revised Progress Schedu'e at no cost to[Ue YORT when,in the <br /> � opinion of the ENGINE-C-R,CONTRAC"COR's sequcnce �f Nork�'aries sienificantly from that <br /> shoum on the Pro�ress Schedule. The POR'f reserves tht �:_ht to withhold pro�ress payments <br /> until such time as an approved modifed Progress Schedule in a Form satisfactory ro the <br /> � ENGINEL-R has been provided by the CONTRACTOR. <br /> 6?2.7 Failure of the CONTRACTOR ro substan[ially comply with the requirements of this paragraph <br /> � section may be considcred grounds for a detern�ination by the PORT that the CONTR.4CTOR is <br /> failing to prosecute the\1'ork uith such dilieence as a�ill ensure its completioc within the time <br /> � specitied, and ro take wli�tever action [lic PORT deem>necessary and approp:iate under Ar�icle <br /> l2. <br /> i <br /> � 6?3 On-Site Documents � <br /> 6?3.1 The CONTRACTOR shall maintain at tt:e Project site,in good order for read} refcrence by the I <br /> � ENGINEL-R,one complete record copy oC the Contrac[Documents, including d�e Addenda. <br /> � Change Orders,and all workine drawin�s, Progress Schcdule,and other appro��ed submittals. <br /> I 6.23.2 The Contract record dra�eings shall be marked ro truly rccord all changes made durine <br /> construction,i.e.,the"as-built"conditions. The location of all existing or new under�round <br /> piping, valves a��d utilities,and obstructions as located during the�1'ork,shall be appropri�tely <br /> , marked on A�e ground until the CONTRACTOR inccrporates the actual field location dimensions <br /> I and caordinates arz inco�porated into tl�e Project's record dra«ings. The Project's record <br /> drawings shall bc updated on a weeUy b�sis and bet'ore elements of the Nerk are covered or <br /> hidden from�iew. After the completion of the�Vork or portions of the Nork and before <br /> requestine final inspection,dte record copy of th�Dra�cings shall be gicen to the ENGINEER. <br /> 6.?4 �Vorl:ing Dra��ings, Pruduct Data,Samples, and OH�cr Submittals <br /> , <br /> 6.2�1.1 Tl�e CON7'R4CTOR shall review and submit all«�od:ine drawings,producc data,smnples and <br /> other itemsrequired by die Convacc Documen[s to be submitted to tl�e PORT accompanied by a <br /> "shop dra�ving multi-vansmittal" Form, supplied by the PORT. Such subminals shall be eiven to <br /> the PORT in a complete and final Coan a[least 30 days prior to any CODITRACTOR nzed for <br /> review response or such otl�er longer[ime diat may be needed to allow time for detailed review by <br /> the PORT or others. The CONTR4CTOR shall take into account allow sufficient time for the <br /> possibility of rejection of the submittal,necded revisions,and resubmittal review time. <br /> 6?4.3 By submitting worl:in;drawin_s,product data, and samplzs, the CO?v'Tf2.4CT0R represents that it <br /> has determined and ve�fied all matzrials, field measurzments, and rela!zd fizld ronstruction <br /> j criteria are in accordance with the Contrxt Documents, and that the CON'IRRCTOR has checked <br /> a��d coordinated the infarn�ation contained widiin du submittal with L�e requirements of the\Vork <br /> and the Contract Documents. The costs incurred by tlie PORT to reciew resubmitted wad:ing <br /> 1 <br /> 00700 -3� <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.