My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
607 11TH ST 12TH ST MARINA 2016-01-01 MF Import
>
Address Records
>
11TH ST
>
607
>
12TH ST MARINA
>
607 11TH ST 12TH ST MARINA 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2017 2:52:09 PM
Creation date
4/4/2017 7:30:59 AM
Metadata
Fields
Template:
Address Document
Street Name
11TH ST
Street Number
607
Tenant Name
12TH ST MARINA
Notes
VOL 1 & 2 - UPLAND WORK PROJECT MANUAL & HALF SIZE PLANS APPROVED
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> I PORT OF EVL-RL-TI SECTION 00700 <br /> 12T"STREE7'nIARINA—VOLUIv1E 1:MAItINE WOkK GENr`.RAL CONDITIO?vS <br /> � replace the Nork to the standard required by the Contract DocumenL,all at the CO\TR4t;T0R's <br /> I espense. <br /> , <br /> 6.222 If any other portion of the Work lias been covzred or completed, the CONTRACTOR shall,upon <br /> � the request of the ENGINEER,remove or uncover such\Vork for the ENGINEER's observation. <br /> The CONTR4CTOR shall subsequendy resrore that portion ot the R'ark ro the standard required <br /> by the Contract Documents. <br /> 6.28 Correction of��'ork <br /> 6?S.1 7 he CONTR4CTOR shall, at no additional expense to the POR"I',promptly conect all��'ork <br /> I <br /> �vl�ich is d�.fective or odierwise fails to wnform to the requirements of the Contract Documenis. <br /> I Such Work shall bc correctad ec a though it�cas preciousl}'inspected by die PORT;payr�ent nr <br /> it was included in a progress payment, µ'hether or r.ot i[�vas comple[ed,and whether or not it u��s <br /> observed before or aCcer the date of Substantial Completion. <br /> , 6.35.2 If,���ithin onc year afler Substantial Completion of the\Vork(except as othenvise may be pro�•idcd <br /> pursuant to par�eraph 13.7)or within such loneer period oF time as may be prescribed by la�c or by <br /> � the rerms of any applicable additional warranty required by the Contract Docmnents, an}'of the <br /> ��'ork is found to be defective or odrenvise not in confortnance witl�the Convact Documen�s, the <br /> CONTRACI'OR shall,at its cost,prompUy coaect sech defective or non-confomiing R'o:k after <br /> receipt of w'itten notice from the PORT eo do so. The oblieation oi t6is subparaeraph shall <br /> � survive lermination oi l;�c Contract. <br /> 6.28.3 If ihe CONTRr�CTOR refuses ur neglects ro correct the defects as the L?�GIi�`L-ER may direct, <br /> I then the PORT:nay obtain,use and employ materials, labor,tools and implemcnts to do the same <br /> and tl�e expense thereofshall be deducred from none}s�chich may othennise Ue then due or <br /> thereafier,nay become due to the Contract,or Qte PORT. If the CO^ITRACTOR fuils ro pcomptl}' <br /> cotrzct defective or non-conCorniing Work,the PORI'may correct it as provided in paraeraph <br /> I6.26,or may tenhinate tius Contrac[. <br /> 6.25.4 \Vork corrected by tlie CONTRACTOR pursuant to paragraph 6.?S shall also be subject to the <br /> � provisions of diis paraeraph to lhe same extent as\Vork uriginally perfocmed and for an additional <br /> one-year period. Such one-year time period shall comnunce upon the acczptance b}'[he POR'r of <br /> the cortected Work. <br /> ( b.28.5 Nothing contained u�this paraeraph 6.?S shall be conswed ro establish a period of limitati, n H'ith <br /> � respect to any other obligation imposed on Ihe COA'TRAC7'OR by the Convact Doccmenls or <br /> law, including the oUligatiuns imposed by par�erapli 6.?0. The establishment oithe time period of <br /> � one year afler the dace of Final Completion Aceeptance or such longer period of time as may be <br /> � prescribed by law or Uy d�e tcrms of any u�arranty required by[he Convact Documents relates only <br /> to u:e specific obligation of the CONTR4CTOR to cortect defectice or non-conformine Nurk. <br /> and bears no relationsl�ip to the time within wl�ich the CONTR4CTOR's oblieation to comply <br /> wid�the Contract Documents may be s�ueh[to be enforced,nor to the time wi�hin u•hich <br /> proceedin�s may be comnunced to establish d�e CONTR4CTOR's liability with respect to <br /> obligations unposed on it by the Convact Documents or as otherwise may exist in law. <br /> 6?8.G T]�E PORT may,at its sole option,elect to retain defective or nonconfom�in;\Vork. In such case, <br /> the PORT sh:ill reduce d�e Contract Sum in a reasonablz amounc to acrount for such defect or non- <br /> confcunsnce. <br /> � <br /> , 00 i 00 -3'7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.