My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
607 11TH ST 12TH ST MARINA 2016-01-01 MF Import
>
Address Records
>
11TH ST
>
607
>
12TH ST MARINA
>
607 11TH ST 12TH ST MARINA 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2017 2:52:09 PM
Creation date
4/4/2017 7:30:59 AM
Metadata
Fields
Template:
Address Document
Street Name
11TH ST
Street Number
607
Tenant Name
12TH ST MARINA
Notes
VOL 1 & 2 - UPLAND WORK PROJECT MANUAL & HALF SIZE PLANS APPROVED
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
505
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
YORT OF L-VERETT SECTION 00700 <br /> 12�"STRL-LT�L4RINA—VOI.iJ�tE l:NIARINE NORK GtNER.AL COI��DITIOiv'S <br /> drawin;s,product data,and samples may be offset Gom any monies due the CONTRACTOR <br /> when the CONTRACTOR has failed to comply with tlus SuUparagraph. <br /> 6?4.3 Rcaiew and approval by the PORT oC the CONTR4C'IOR's working dra«•ines,product data,or <br /> s�mples shall not relicve llte CONTR4CTOR oFresponsibility for[he accuracy of dimensions and . <br /> details. Such review and approval shall likewise not constimte acceptance by the POR7 of[he <br /> cortectness or adequacy of such submittals,nor shall it constimte a representation or uarranry by <br /> the PORT[hat the drawings will satisfy the requirements of the Convac[Documents.The reciew <br /> of a s�cc;l�c item shal]not indicate approval of an assembly in which the i[em functions.The <br /> POR7"s rcviea�or approval of a submittal shall not relieve the CONTRACTOR&om responaibility <br /> for errors or omissions in the submittals. <br /> 6.24.4 rV�y��brk delaycd by reason of a properly rejectzd submittal ;s deemzd to be entirely dre <br /> CON fRACTOR's risk,and shall not be the basis for a claim by the CONTRAC7OR for <br /> additional compensation or an extensi�n of Convac[Time. Drawings rnarked "subject to change" <br /> or the li};e will not be reviewed. The PURT is not required to review sub�•�it*als that depend for <br /> d�eir.eview on olher submitt�ls not vet submitted. <br /> 6.24.5 When resubmitting a submittal, the CONTItACT012 shall direct speciGc attention, in�criting or on <br /> the resubmitta]itsclf, to all revisions it has made. <br /> (>?4.6 No portion of the l�'ork requiring submittal oCa��orkinc dra���ine,product dzta,or sample shall be <br /> commenccd until the submit�.il has been approved by the YOR7 as pro�ided in para__raph section <br /> 6.23?. All ponions of the Nork ineolving submittals shal]be performed in accordance��ith d�e <br /> appro��ed submittals. <br /> 6?5 Cul[ing, rittin�:md Patching of�Vm�k <br /> 6.?5.1 The CONTR4CTOI:shall be responsible for all wttine, Gttine,patching or such other altering as <br /> may bc required to complete !he Work,or to make its several pans fit together properly. <br /> 6?5.2 The CONTRACTOR shall nut damage or endanger an}'ponion oCthe\Vorl:,other work of the <br /> PORT,or that of any separa�e CONTRACTOR's by cuttin„ fitting,patchine or other alrering of <br /> any work,or by excavatioa Tl�c CCNIIU�CTOR shall no[alter any of the work of the PORT or <br /> any separate CONI RACTOR without«ritten autharization Gom d�e PORT. <br /> (?6 Inspeclion uf Ihc�Vork <br /> (._'6.1 Thc LNGINEER or ENGINL-LR's authorized represemative shall ha�e the riaht but not the <br /> oUligntion to inspect the 1Vork, and to reject and refuse all]abor and materials or methods of <br /> applicatioi�, or any part thcreo:; d»t do�s not comply in}:ind,qua!in or material���i��the <br /> requirements of rhe Convact Documer.ts. Any]abor or material rejected, as not coniomung to d�e <br /> Contrac[Docuuents shal] be prompdy rtmoved,and labor and materials,which do so conForm, <br /> shall be fumished and deli�ered in place thereof, aud if the COAITR4CTOR refuses or ne�lects to <br /> remove such rejected material or to rebuild any such rejected�Vork,or cthern•ise correct the <br /> dcferts as d�e ENGI.^IEE2 may direct, dien the PORT may obtain.use and employ materials. <br /> labor, tools nnd implemencs ro do the same and the expense thereof shall be deducted from moneys <br /> wi:icl�may othen�7se Ue thzn due or d�ereafter may become due to the CONTRACTOR. <br /> C.?7 L"ncovcring of��'ork <br /> 6.'_7.1 If any ponion of the Wbrk should be cu�erzd prior to iiupeciion called for by law or as required <br /> by the Contract Documents, d�e CONTR4CTOR shall,upon request of the ENGI;YEER,uncover <br /> or rcmoce the R'ork for inspection by tt�e ENGNEER or other eovemmental representatices, and <br /> 00 i 00 -36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.