Laserfiche WebLink
e <br /> � PORT OF EVERLTT SECTICN 00?00 <br /> 1'_'T" STRECI'MARINA—VOLUME l: r4ARINE WORK GE?�`ERAL COn`llITIOtiS <br /> � oCor relating to, direcdy oc indirecdy,CO\`ITWCTOR's failure to compk u'ith any oC tlie <br /> reyuiremcnts of G.i9. <br /> � 631 Clcan-up <br /> � 631.1 At all times, and as muy=peci�cally bc requcsted by the ENG[NEER, the COATIL4CTOR shall <br /> clean-up and remove all reCuse�'esultin�from the\1'ork in order that the Project site remains free <br /> from an accumulation of consiruction debris. Upon Eailure to do so within 24 hours after request <br /> � by the ENGINEER,such clean-up Work may be done by the PORT and the cost thereof shall be <br /> charocd to the CONCR4CTOR and deducted from die Contract Sum. <br /> � 6.3].2 Upon completion of the Work a�d befure final inspection,the CON"IR4Ci OR shall clean the <br /> entire Work premises occupied or used in connection u'ith d�e\Vork of all rubbish,surplus and <br /> discarded materials, False work,temporary structures,equipment,and debris. The entire�Vork <br /> premises shall be Ieh in a elean,neat,and presentable ecndition. The CON7�1L4CTOR<V�all no[ <br /> �I remoce warnine,regulatory,or guidc si�zns prior to I�in:+l Completion.Acceptance except a, <br /> requested by d�c ENGINF.ER. <br /> ( fi3? Protec�ion ot��'ork During Suspension <br /> 632.1 In preparation for and during any suspension of 1Vork as pro��ided in paragraph 13.1,Uie <br /> CONTKACTOR shall take every precaution to prevent dam�ge to,or deteriomtion of, [he�Vork. <br /> I Ezcept as provided clsewhere in the ConVact Documents,[he COVTR4CTOR shall be <br /> � respensible for all damage or deterioration to tl�e Nork during thc period of suspension and shall, <br /> at its sole e�pense, �onect or restore the R'ork tu a condition acceptable ro the ENGINEER prior <br />, I to resumine Nork A susper.sion of Nork shall not relieve the CONTRICTOR of any of its <br /> responsibilities under thc Convact Documents. <br /> 633 Sur�cr <br /> I6.33.1 Thz POR1' c:ill set on::benchmark usin_ �he proper ele��ation datmn and�eill cstablish one line of <br /> reference in the vicinity oC the prc�ect. All construct�on sun'ey shall be accomplished by the <br /> � CONTRACTOR. <br /> 6.34 ArchcologicalIlems <br /> ( 63d.1 If resources of potential archeolocical sienilicance are encountered durinc constructien or <br /> Iexcavation,d�e following steps sLatl be t�kzn. <br /> � a. The CONTR.4CTOR will inmiediately stop work in d�e vicinitV of d�e find and notify the <br /> L-NGINLER. <br /> b. 24-Hour security will be arranged. <br /> c. If the ti��d includes human rem�ins,the ENG ,NEER shall immediately notify d�e following: <br /> � 1. PORT Security <br /> 2. Snohonush Caunty�Icdical Examincr <br /> d. The I'ORT Security and ihe Snohomish County Medical Esaminzr shall detzrmme if the human <br /> � remains are of archeoloeical significance. The resources shall not be moced unless the resources <br /> are detem�ined to havz no archeolo��ical sicnificance. <br /> e. The biedical Examiner's d�:terminations will be Vansmitted by die ENGINEER to: <br /> 1. State Office of.4rchaeoloe}'and Histonc Presen'ation <br /> � 2. Tulalip Tribe <br /> f. The press�vill not be notificd prior to notification of Tnbal�roups. <br /> e. The PORT and its CONTRACTOR sl�all �cork with a proCessional archaeologist to rzsume <br /> � construction as soon as possible uiiliout compromisine the archeolocical Find. <br /> 00 i00-39 <br /> ( <br />