Laserfiche WebLink
PORT OF EVTRLTT SECTION 00700 <br /> I'_'" STREET DdARIN:�— \'ULU>IL- L �I:UtINE \�"ORK GENF[Z4I.CO\`DITIONS <br /> b.35 Gr:rtuitics <br /> The COIJTRAC"I�OR sholl not extend an�loan.gramity.or�.ifl of mone}'or sen�ices in any form <br /> a�hatsoe�er to any zmployce or of�cer ol the POltl'or PORI consultant, nor shali the COA'TIZ4CTOR rent <br /> or purchase any equipment,materials,or sen�ices from any employee or officer oi the POR"i or PORT <br /> consultant. <br /> 6.3( Notice nnd Detailcd Brcakdo��•n uf Claim <br /> 6.36.1 Noticc. If unforeseen conditions or changes in die Work arise for���hich the CONTRACTOR <br /> bclicves an equitable adjusm�ent in time or money or any other adjustmcnt in Contract Time or <br /> Contract Sum is or will be due, the CONTRACTOK shall eive the PORT immediate oral notice <br /> foflowed by written notice within seven(7)days o: such event,which notice in all events must be <br /> given and the L-NGPIEER's direction recei��ed prior to pedonnine the�\'ork which <br /> CONTRAC7OR believcs entides it to such adjustments. Such notice must identify in delail thc <br /> basis for tl�e claim. The date such«Titten notice is received by the PORT shall define die start oC <br /> time for any purpose recardine the claim. <br /> 6.36.2 Detailed Breakdo�w�. \Vithin 30 calendar da}'s of die PORT's receipt of wriiten notice aUo��e, the <br /> CONTRACTOR shall provide the PORT with a ��Titten breakdo«n of all of:he elements and sub <br /> elements of the claim detailing tl�e increase in ihe Contract time or Convac!Sum bzing soueht. <br /> C363 li the CONTItACTOR fails to satisFy thc requircments ef this paraeraph,tl�e COiQl'RACTOR <br /> shall be dcemcd to ha��c waiced all riehts to asscn the claim against the PORT. <br /> 6.37 Prcrequisite lo Suil <br /> No legal ac[ion against the POI:�I'ma}'be tiled on account of a claim or other liabilitp urising out of or <br /> relutcd to the Project unless: ! <br /> a The requirements oCparagraph 636 have been complicd with,and <br /> b. The procedures of Ariicle 14 have bcen eshausted, and <br /> c. The la���suit is filed and served on the PORT witlun I SO days of tl�e date of Substantial <br /> Completioa The CONTItACTOR's fuilure to strictly comply�i�ith all requiremenU of this section <br /> shall be a complctc bar to any claims, suit or cause of action aeainst die POIiT. <br /> (.33 Respm�sibilih' for Damagc <br /> 638.1 The CONTiU1CT0R shall bear sole responsibility for any pollution��'hich may occur as a result of <br /> its operations, u�cludine but not limited to soil. air, �vater, noise, or od�er pollution, includine bu[ <br /> not]imited to any custs (including at[omeys' m�d consultants'fees),penalties,or other liabilities <br /> imposed or sought to bc imposed as a result of such pollution. <br />�P 63S? The CONTR�.C;'OR shall protect fiom damaee cll prn�ate,public,and PORT-o«ned utilities, <br /> including but not limited to conununication lines,poa,er lines, se�cer and water lines,railroad <br /> tracl:s and appunenances, vafCtc ]i�hting and signal systems,and similar facilities. <br /> G.3S3 The CONTRACTOR shall bz responsible for damaee to the Cvork caused by winds, stoans, or <br /> otl�er eauses,and must ma}:e�ood any defects arisine &om or diswcered in the\Vork until Final <br /> Completion of the��'ork. <br /> 00'%00 -40 <br />