My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3121 8TH ST AB 2016-01-01 MF Import
>
Address Records
>
8TH ST
>
3121
>
3121 8TH ST AB 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2017 8:17:36 PM
Creation date
4/4/2017 7:31:30 AM
Metadata
Fields
Template:
Address Document
Street Name
8TH ST
Street Number
3121
Unit
AB
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Junc l, 2008 <br />Duplex I3uilding <br />L�A Job No. AA05> <br />1'agc 5 <br />GROUNllWA"I'I?!2 CONUI'i'ION <br />Groundwater seepage was encauntered in any of the four tcst pits exclvatcd on ihe sitc. Thc <br />very-dense, weakly-cemented, fresh Vaehon till deposit underlying the site at shallow depth is of <br />extremely low permeability, and would perch stormwater infiltrating into thc more penneabic <br />surficial soils. The amount of and the depth to the nenr-surrace perched groundwater would <br />tluctuate seasonally, depending on precipitation, surfacc runoff, ground vegetation rover, site <br />ulili•ration, and other factors. This perched groundwater may dry up compl�tely during the drycr <br />summer �uonths and accumulate and rise in the wet winter months. <br />llISCUSSIONS AND RGCOMMCNDATIONS <br />G�NCRAL <br />I3ascd on thc soil conditions encountered in tlie site subsurfacc explor:itions, it is our opinion that <br />the site is suitable for the proposed devclopment from the geotechnical engineering viewpoint, <br />provided that the recommendations in this repori are fully implemented and observed during <br />construction. Due to sensitive natwr of the steep slope (lanking the east side of the site. wc <br />recommend that grading and foundation const�vction «�ork (or tfie proposed duplex buiiding be <br />c�rried out and completed during the dryer period from April 1 to October 31. If work has to <br />procced in the wetter months beyond this dryer period, the measures recommended in tliis report <br />for slope stabilization, erosion mitigation cmd drainage control should be in place and operational <br />on a daily basis during construction. <br />The surficial fill and topsoil should be stripped down to medium-dense weathered soils witliin <br />the driveway, :�nd the surficial fill a�id topsoil and wcathered soils should be stripped do�vn to <br />very-dense fresh till soils within the building pads. The un�erlying fresh till soils are of high <br />sliear strcngth and are capablc of� providing exccllent Coundation support to ilie proposed duples <br />building. <br />LIU & ASSOCIATES, iNC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.