My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3121 8TH ST AB 2016-01-01 MF Import
>
Address Records
>
8TH ST
>
3121
>
3121 8TH ST AB 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2017 8:17:36 PM
Creation date
4/4/2017 7:31:30 AM
Metadata
Fields
Template:
Address Document
Street Name
8TH ST
Street Number
3121
Unit
AB
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Juncl,2008 <br />Duplex Building <br />L&A Job No. 8A0>5 <br />Page 7 <br />Scismic Iia�card and Ucsign Considcration <br />The T•ugct 5u;:nd region is in an active seismic �one. 'fhe subject site is undcrlain at shallow <br />depth by very-dense Gesh till soils of high shcar strengih. The site is mostly gently to moderately <br />sloped. Thcre is a lack of continuous, ex[ensive groundwater table at shallow depth under thc <br />sitc. "I'he combination of the �bove makes it rather unlikely for seismic t;azards, such as <br />liquefaction or soil lateral sprcading, to occur on the site during strong carthquakes. Therefore, <br />the scismic hazard of tlie site should bc also be minimaL Thc proposed duplex building should, <br />however, be designed tu withstand scismic foroes induced by strong carthquaices. Based on ilie <br />soil conditions encountered by the test pits, it is our opinion that Sei�mic Usc Group I and Site <br />Class D should be used in the seismic dcsign of the proposed residences in accordance ���ith tt:e <br />2003 International 13uilding Code (!BC). <br />SITG PRGPARATION AND GF,NERAL GRADING <br />Site preparation should include clearing and grubbing within construction limits. Surlicial till, <br />topsoil and �veathered soils should be stripped down to very-densc fresh till soils within the <br />building pad of the duplex building, and thc fill, topsoil should be stripped do�*m to medium- <br />dense weathercd soils within thc drivcway. 'fhe exposed ground should be compacled to a non- <br />yiclding state with a vibratory roller compactor and proof-rolled with a fully loaded dump tn�ck <br />or water truck. During construction, stomi runofC �id near-surface perched groundwater, if any, <br />should be intercepted with d�tches or interceptor trench drains, as required, and conveyed into a <br />nearby stomi inlet covered with a fi'tter fabric sock. The filter sock sltould be cleaned <br />periodically to prevent clogging and should be removed after the completion of the construclion <br />�vork. <br />'Che onsite sur�icial soils contain a high percentage of fines and are sensitive to mois[ure. A layer <br />of clean quarry spa(ls placed over excavated areas and areu of frequent trat'fic may be required to <br />LIU & ASSOCIATCS, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.