Laserfiche WebLink
June l, 200R <br />Duplex 13uilding <br />L&A .lob No. AA055 <br />Pagc 12 <br />on critical arcas, mitigation of impacis on critical arcas, itnpact of utilit�� installation and roudway <br />construction on geologically hazardous areas, etc. <br />The subject site is underlain by very-dense fresh till soils of high shear strength with high <br />resistance against slope fuilures. "rherefore, geological restraints of the site �vhich may impact <br />the stability of the adjacent steep slope (lanking thc east side of the site are either non-existent or <br />can be minimized to an acceptable level of risk if the recommendations in this report are fiilly <br />implemented and observed. The vegetation cover on this steep slope should be preserved and not <br />to be disturbed. Are�s devoid of vegetation cover due to construction �etivities should bc seeded <br />and re-vegeLated as soor. as possible. We understand tha� t�rading of building pad and driveway <br />and building lootprint excavation for the development of thc duplex b!:ilding will be achieved <br />with ecnventional earthwork equipment. If the mcommendations in this report are followed <br />during graJing work, the construction tnethod and techniqu� should have little impact on the <br />stability oCthe adjacent stcep slope. Since the driveway and utility lines will approach the duplex <br />from the street sidc and uphill side away Gom the adjaccnt steep slope, driveway construction <br />and utility installation sh.�uld also have minimal impact on the stability of the adjacent sleep <br />slope. <br />According to the design plans of the duplex building, this building is to be set back about 10 to <br />2� fect from the crest of the adjacent stcep slope of 40% and more grade. It is our opinion that <br />this selback will be adequate for the duolex building to maintain long-term stability, provided <br />that: 1) the tboting loundations of the building is embedded at least 6 inches into the very-dense <br />fresh till soils and, 2) the footing fomidations are constructed in accordance with the <br />recommendations under the BUILDING POUNDATIONS section in this report. <br />LIU & ASSOCIAT�S, INC. <br />