My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3121 8TH ST AB 2016-01-01 MF Import
>
Address Records
>
8TH ST
>
3121
>
3121 8TH ST AB 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/19/2017 8:17:36 PM
Creation date
4/4/2017 7:31:30 AM
Metadata
Fields
Template:
Address Document
Street Name
8TH ST
Street Number
3121
Unit
AB
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.lunc l. 2008 <br />Duplex [3uilding <br />L&A Job No. 8A055 <br />Pagc 15 <br />12unoff ovcr Itnpervious Surfaces <br />Storm runol�Covcr impervious surfaces, such as roofs and paved drivc«ay, sh�uld bc collectcd by <br />underground drain line systems connected to downspouts and by catch basins installed in pavcd <br />�Iriveway. Stormwater thus collcctcd shoul�l bc tighUined to dischargc into a storm se�ver. <br />Duilding Footing Uruin <br />A subdrain should bc installcd, aruund thc perimctcr Ibotings uf thc piuposcd �luplcx building. <br />The subdrain should consist of a 4-inch-minin.um-diameter, perforated, rigid, drain pipe, laid a <br />fe��• inches below bottom of the perimeter footings of the building. The trench and the drain line <br />should have a sufficient gradicnt (0.5% minimum) tc generate llow by gravity. The drain line <br />should bc fitted with a non-woven filtcr fabric sock and completely enclosed in clean ���ashed <br />gravel. "I'he remaining trench may be backfilled widi clean on-site soils. Water collected by thc <br />perimeter footing subdrain systeni should bc � ohtlincd, ceparutcly I�om thc rooC and surl��cc <br />stomr.vatcr tJrain lines, to dischargc into a stami sewer. <br />SurEacc Drainagc <br />Water should not be allowed to stnnd in any areas where (ootings, on-grade-slabs, or pavement is <br />to be constructed. �inish ground surface should be gradcd to direct surface runoff away from the <br />proposcd duplex building. We recommend the finish ground be sloped at a gradient of 3 perecnt <br />ntinimum for a distancc of at Icast 10 fcet away lrom thc building, escept i❑ the areas to be <br />paved. <br />Clcanouts <br />SuCficient number of cleanauts at strategic locations should be provided lor underground drain <br />lines. Thc underground drain lincs should be cleaned and maintained periodically to prevent <br />clogging. <br />LIU & ASSOCIATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.