My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2232 12TH ST 2016-01-01 MF Import
>
Address Records
>
12TH ST
>
2232
>
2232 12TH ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 9:17:31 AM
Creation date
4/4/2017 9:16:20 AM
Metadata
Fields
Template:
Address Document
Street Name
12TH ST
Street Number
2232
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
��� � �F4�.. �' � ���� � ' �, � <br /> r ' � � �� '. 1� <br /> I ' <br /> ����������� �����, � � <br /> Geotechnical Er�gineering and Geoiogy <br /> --_---A-February 26, , yti5 L•'-255�— -' <br /> � <br /> Everett Land AGsociatinn � ! <br /> 2750 Northup Way, Suite 30Q ' <br /> Bellewe, Washingr.on 9t3U04 <br /> Attention: Ronnie Ecker <br /> �entlemen: <br /> We are ��e,iscd to submit her�with our r�rpnrt antitled "Geotech- <br /> nical �ngineering Study, ProE�os�d Apartments: 12[h Street and <br /> Rainier, Everett , Washington" . 'fhis reporC presents the results <br /> of our field exploration, laboratory tesrs, and enyineeriny <br /> analysis. The purposr and scope of our study was outlined in our ' <br /> proposal dated Febr. uary 22, 1985. <br /> i <br /> Our study indicates that the pro�osed buildiny area zs i <br /> yenerally underlain by clayey and sandy silts above aens-, <br /> glacially consolidated soi.ls. shallow fills exist in the � <br /> northeastern portion of the site. The proposed buildiny may be i <br /> supported on cunventional spread Eootings bearing on undisturbed i <br /> native soils or on compacted fill . The following sections of khis <br /> report describe our study ar.d contain recommendations reyardiny � <br /> foundation desiyn criteria, earthwork considerations, and site I <br /> drainage. <br /> i <br /> This report has been prepared for specific application to this j <br /> project in accordance with yenerally accepted geotechnical i <br /> engineering pr.actices Eor the e�:clusive use of the Everett Land <br /> Association and their representatives. Nr� other warranty, <br /> I expressed or implied, is made� We recominend tliat this report, in ,' <br /> its entirety, be included in the project contract documents for � <br /> the information of ths contractor. <br /> PROJECT DESCI2IPTION � <br /> At the time our study was perEqrmed, the siLe and proposed <br /> building locations were as shown achematically on the Test Fit <br /> Location Plan, Ylate 2. <br /> I Based on our discussions with your architect, we understand <br /> that it is planned to construct four-story, wood frame apartment <br /> str.uctures . Cuts and fills of two to three feet are anticipated <br /> �or site development. Slabs-on-yrade or crawl s�aces may be used. <br /> 1805 13oth Pi;�ce N E . Sui�e 101. Bellevue. Washing�o�� 9ftpp5 <br /> Phone (206) 643-3780-Seattle (206) 464 1584 <br /> v <br />
The URL can be used to link to this page
Your browser does not support the video tag.