Laserfiche WebLink
6. Drainage - The propo.sed project and design shall meet the <br /> requirements of the City's Drainage Regulations; <br /> Finding: The subject property is within the Swamp Creek <br /> Drainage Ba�in. The applicant proposal may not be required to <br /> plovide on site detention if the project is less than 5,000 square feet <br /> of impervious surface. <br /> Conclusion: The proposed project may be below the required on- <br /> site detention standards. <br /> 7. Open Space and On-Site Recreation - The proposed project and <br /> design shall meet tlie requirements for Open Space and On-Site <br /> Recreation as de(ined in EMC 18.28.250 and 18.28.260 uf this <br /> Ordinance; <br /> Finding: Tlie applicant's site plan provides for rear yard open <br /> space that exceeds the required minimum open space <br /> requirements and a recreation/park is not required since th�: project <br /> belo�v the on-site recreation requirements. <br /> Conclusion: Tliis projecf exceeds tl�e minimum requirement of <br /> 600 square feet for oii-site open space. <br />( 8. Fublic Services - The proposed project shall be designed tc meet <br /> the following: <br /> a) Adequate water supply to City Standards; <br /> Finding: There is an existing 4-inch �vaier main in 13"' <br /> Avenue West. A woterstub must be provided to each lot. <br /> Conclusion: Adequate water supply (or(ire flow may not be <br /> able to be provided to tliis short subdivision per City <br /> Standards. Fire sprinkler systems may be required. <br /> b) .4deryuate sewage disposal to City Standards; <br /> Finding: There is an existing sewer main in 13�h Avenue <br /> West. A sewer stub must be provided to each lot, <br /> Conclusion: Adequate se;ver disposal can be provided to <br /> City Standards. <br /> c) Appropriate surface watermanayement to City Standards; <br /> Finding: Tl�is project may not be required to provide on-site <br /> dstention. The preliminary calculation is below the 5,000 <br /> square feet o(impervious suriace. <br /> Conclusion: Appropriate surface water management is <br /> required. At plan review calculation will need to be provided , <br /> (or a determination o(detention requiremenfs required. �, <br /> ; I <br />