Laserfiche WebLink
il <br />� �I <br /> , , <br /> � <br /> ATTACHMENT "B" <br /> I� for Shoreline Substantia! Development Permit <br /> il <br /> il SMA ��5-81 <br /> I <br /> � <br /> i� I' Detailed drawings shall be submitted to the Public Works Department showing <br /> �� parking layout, landscaping, utilities, storm drainage, temporary construction <br /> Ierosion control and all required improvements in the public right-of-way. Public ' <br /> II Works Department aoproval of these drawings is required prior to any permits � <br /> being issued. All improvements shali be completed, approved and bonded before <br /> �i the Occupancy Permit is issued. <br /> i 2. City Streets and alleys are to be kept clear of dirt and debris at all times during ��, <br /> consiruction. Dust suppression and street cleaning must occur as directed by the <br /> � . Public Works Inspector. <br /> I 3. During construction, all truck traffic to and from ?he site within the City of ,� <br /> Everett shall be on arterial streets unless otherwise approved by the Public <br /> Works DepartmeM. � <br /> � <br /> i <br /> �(' 4. Stre�t improvements, except sidewalks, in conformance with 555-76 and 793-81 i <br /> � are required. --- ! <br /> II S. Water syst�m must be extended to the site from the existing public system. <br /> � 6. As-builts of water system will be required to be submitted per the foll�wing <br /> Ischedule: <br /> � Water As-Builts must be in the form of the original stamped my:ar and <br /> i shall be submitted with easements as required within 30 days of connection. i <br /> i7. Sanitary system must be extended to the site from the existing public system. j ' <br /> I8. Participation in the cost to fund the North End Sewer Interceptor is required. <br /> i The approximate cost based on the preliminary information proaided is $I214.58, � <br /> � as of DPcember 12, 1981. The actual cost shall be computed by the Building � <br /> �� Department per the ordinance in effect at the time and according to the <br /> information provided on the approved plans on the date of permit issuance. <br /> il 9. Stormwater runoff should be conveyed to the bay. A baffle-type oilseparator is <br /> requirecl. If stormwater is conveyed to the combined se �er system, a drainage <br /> � fee will be required in lieu of on-site detention. <br /> I <br /> i 10. Applicant will submit erosion control plans to Public Works DepL <br /> � <br /> i <br /> � 11. A preconstruction ,:onference between applicant, Planning Department and <br /> Public Works Department may be required prior to approva! of Public Works <br /> j Permit. <br /> � <br /> I� <br /> � <br /> --a <br /> � <br /> � - <br /> �I <br /> � <br /> �� <br /> �I <br /> � , <br />