My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1818 13TH ST PEMC 2018-01-02 MF Import
>
Address Records
>
13TH ST
>
1818
>
PEMC
>
1818 13TH ST PEMC 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2020 11:50:25 AM
Creation date
4/4/2017 11:17:57 AM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1818
Tenant Name
PEMC
Notes
PARKING GARAGE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�w�oa.-o�� <br /> lV[�R?�HS�H� <br /> PROVIDENCE EVERETT MEDICAL CENTER <br /> COLBY CAMPUS CONSTRUCTION PROJECTS <br /> CONSTRUCTION MITIGATION PLAN <br /> February 7, 2006 REVISED Februs;✓ 9, 2007 <br /> PURPOSE <br /> The purpose of this plan is to organize and communicate the efforts of the <br /> construction team to plan for and safely manage the interface :hat construction <br /> related activities will have on the surrounding community and the City of Everett. <br /> The following sections describe the planning at this date for the key components <br /> of coordination between the project and the community. <br /> Site Pian <br /> The attached site plan indicates where cranes will be located on the project site, <br /> the primary construction entrances for the ongoing Cancer Center project and the <br /> pending parking garage project, construction fences, pianned sidewalk and <br /> parking space closures, and other specific elements related to planned <br /> construction in the vicinity. <br /> Securitv <br /> All projects will have a security site fence that will o�nerally be driven posts or <br /> semi-permanently anchored to existing structures. . amporary moveable fenc�ng <br /> will be used when rigY�t of way improvements (sidewalks, curb & gutter, etc.) are <br /> undertaken. There is no plan to provide visual barriers at the conatruction <br /> fencing. All fencing will be in place and gates locked at the end of each workday. <br /> Warning signs will be posted every 50' indicating restricted access to the project <br /> site and noting safety requirements on the project. The construction parking area <br /> at the north half of the Everett Community College recreational field, will also <br /> have a security fence surrounding the planned parking and materials staging <br /> area. Access into and out of this fenced area will be from 13'h street, via the <br /> existing community college entrance. In addition, temporary construction offices <br /> will be located on the existing community college tennis courts. Utilization of this <br /> space will expand or contract based upon project needs. <br /> At all areas, additional sacurity lighling will only be added as necessary thereby <br /> minimizing the affect of these Iights on neighbors. This added security lighting will <br /> be designed a,�d installed so that it is shielded from direct glare on nearby <br /> �,� I <br />
The URL can be used to link to this page
Your browser does not support the video tag.