My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1818 13TH ST PEMC 2018-01-02 MF Import
>
Address Records
>
13TH ST
>
1818
>
PEMC
>
1818 13TH ST PEMC 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2020 11:50:25 AM
Creation date
4/4/2017 11:17:57 AM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1818
Tenant Name
PEMC
Notes
PARKING GARAGE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
residential areas and public right-of-way (un�ess thF right-of-way is the area <br /> where additional lighting has been specifically requested). <br /> 1 <br />' All construction storage areas will be fully fenced and locked at any time that <br />; work is not taking place. There will be no full tim2 3rd party security. If/when this <br /> scale of security monitoring becomes necessary, an outside security firm will be <br /> engaged for off-hours monitoring. <br /> For securiiy specific issues, everyone will be encouraged to csll 911 in an <br /> emergency, or the Colby Campus security office at (425) 261-3911 for non- <br /> emergency security issues or after hours concerns. <br /> For non-security construction issues the contacts will be Mortenson's project site <br /> office at (425) 259-9140, or Mr. David Wachob (PEMC) at (425) 258-7902. <br /> Construction Entrarces <br /> The only construction entrar�ce into the Cancer Center project site will be as <br /> noled on 13'h street. All material delive�ies and equipment access will be through <br /> this entrance. Parking on the north side of 13'" will be closed from the <br /> intersection with Wetmore east to the eritrance into the Everett Community <br /> College building just east of the intersection at Rockefeller. Some additional <br /> parking may be closed and utilized further east for specific limited tasks on the <br /> project. This ciosed parking area will be utilized to stage deliveries of concrete, <br /> structural steel, mechanical equipment, etc. <br /> Additionally, if there arises the need to 'stage' or 'que' delivery trucks, an <br /> alternative holding area may be used on the east side of Rockefeller between <br /> 13'h and 14�" streets. In this situation, 14'h ctreet will be used as the primary <br /> inbound delivery route, and 13"' street as the primary outbound route back to <br /> Broadway. <br /> The construction entrance for the parking garage project will be ir,to the soulh <br /> end of the site off of 14"' Street in alignment with the existing alley. The exit will <br /> be in the same alignment out the north end of the site onto 13'�' Street. As the <br /> project progresses past the excavation phase, all or a p.xtion uf Rockefeller <br /> between 14"' Street and 13'h 5treet will be closed for construction use and <br /> access. If Rockefeller can remain open to traffic, the parking and sidewalk along <br /> the east side of Rockefeller between 14°i Street and 1::'h Street wiil be closed for <br /> construction use and staging. In addition, during the heavy steel erection phase <br /> of the parking garage structure, steel delivery trucks v✓ill be staged and off-loaded <br /> from Rockefeller requiring all or a portion of Rockefeller to be closed to traffic for <br /> safety. <br /> Traffic control will be essential and will be provided by means of a trainEd <br /> flagging person or persons at all project gates and whenever the intermingling of <br /> right-of-way improvements and traffic is unavoidable. <br /> �,W '- <br />
The URL can be used to link to this page
Your browser does not support the video tag.