My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1818 13TH ST PEMC 2018-01-02 MF Import
>
Address Records
>
13TH ST
>
1818
>
PEMC
>
1818 13TH ST PEMC 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2020 11:50:25 AM
Creation date
4/4/2017 11:17:57 AM
Metadata
Fields
Template:
Address Document
Street Name
13TH ST
Street Number
1818
Tenant Name
PEMC
Notes
PARKING GARAGE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
324
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRUCK ROUTES <br /> The primary delivery route for the prcjects will be from Broadway Avenue to 13`h <br /> Street and Broadway Avenun to 14`h Street, into the project gates. All contractors <br /> and delivery personnel will ba instructed to use these as the primary routes for <br /> access to either project. Construction deliveries to the Cancer Center will <br /> diminish in the 2nd quarter of 2007, and tiie primary construction related traffic <br /> pattern will be for�.he parkinq�garage project, and will follow Broadway to 14"' <br /> Street to the proje�t, and 13` street to Broadway from the project site. <br /> If these haul routes prove unworkable for the City and traffic conditions, a third <br /> aiternative will be discussed to move trucks west on 13'h Street, north on Colby, <br /> east on 10�h Stree;, then north on Broadway. This route will need to be reviewed <br /> with the Cit� prior to implementation. <br /> All contractors and vendors will be directed to maintain below speed limit speeds <br /> on neighborhood streets, 3nd to avoid any compression breaking. Loads will be <br /> covered when required by City ordinance, State law, or other governing authority. <br /> The parking garage project site will utilize a wheel wash to minimize the potential <br /> for mud and dirt on surrounding streets. Additionally, flaggers at the project site <br /> will be required to visually verify that all trucks leaving the site are not carrying <br /> mud on their tires. Periodic and as-needed street sweeping is planned and will <br /> also be included as a requirement for Subcontractors who wili have ongoing <br /> trucks at the site. <br /> See the foilrn,ving haul route plan noting streets to be utilized as described above. <br /> �W � <br />
The URL can be used to link to this page
Your browser does not support the video tag.