Laserfiche WebLink
� � � <br /> rinding#7. See Finding#5. <br /> Off-Strcet Parkini; - Section 3.6 of the Master Plan requires off-street parking to be <br /> providecl as dctermined by the City upon appiication for eacli phase of development, <br /> U�sed upon a parking study submitted by PEMC. Scction 3.9.1 allows portions of thc site <br /> to be used as temporary parking, �+�hile Section 3.9.2 requires thc landscaping of any area <br /> used for temporary parking to be detennined liy tl�e Planning Director. <br /> Ginding#S. Tlte applicant proposes a 25 space parking lot south of tlte utility Uuilding, <br /> wliich will serve staff working in the utility building and o�;ersize vchicles that do not fit <br /> into either of thc hvo parking garages adjacent to tl�e site. The SEPA chccklist states tl�,it <br /> staffing of die utility Uuiiding�vill be 1 to 3 employees. TLe area in which the surFacc <br /> p�rking is proposed is allowed to be used for parking by the Master Plan. Landscapinb of <br /> thc parking lot and adjaccnt arcas is proposcd. <br /> Pedestriai� Conncctions—Section 3.7.1 of the Master Plan mquires safe and attractivc <br /> pedestrian linkages for pedestrian travel, including connections to the neighborhood, tlie <br /> location of which shall be determined during each phase of development. <br /> Finding#9. The proposal includes pedcstrian walkways comiecting to abutting streets at <br /> 13°i Street, 12°' Street on both the east and west sidcs of tlic}'�roperty, Rockefcller <br /> Avenue, and Oakes Avenue. <br /> Vchicular Acccss—Section 3.7.2 of the Master PI1n states that primary vehicu(ar access <br /> will be from 13`�' Street. Section 3.83 of the Master Plan states that prior to construction <br /> of Uie first major Uuilding od�er than the Utility Building on the ECC Properiy, PEMC <br /> will provide a traffic aualysis sho�ving thc advantages and impacts of accessing the �CC <br /> Property on its eastcrn boundary from 12`�' Street. <br /> Ginding#(0. Vehicic access to the utility building i� proposed or.:y from 13°i Street. <br /> Utilitv Building Requirements- Section 3.10 of the Master Plan contains thc following <br /> requircmcnts for dtc Utility Building: <br /> 3.10.I The Pliase I Utility Building wiil be located south of the projccted <br /> ceiiterlinc oP 12'�' Strcet and sited within the area desibmated for a <br /> maaitnum of S� fcct in hcigl;t. <br /> P'inding# 11. The utility building is nroposed to be located within the area designated <br /> Uy tl�c Mastcr Plan. <br /> 3.10.2 The generator and boiier exhaust will mcct or exceed thc applicable <br /> cmission rcquircmcrds of the Occupational Safcty and Heaitli <br /> Admiui�lratiuu (OSHA) �nd the Amcricau Coufereuce of Governmental <br /> [ndustrial Hygicnists (ACICIH). <br /> 5 <br />