Laserfiche WebLink
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM,1997 TO 2002 <br /> Agency:City of Everett <br /> City No.: 0420 Hearing Date Pg 5 <br /> County No.: 31 Adoption Date <br /> MPO: PSRC COLLECTOR ARTERIALS Resolution No. <br /> F P PROJECT IDENTIFICATION I S T U PROJECT-COSTS-IN 1HOUSANOS OF DOLLARS <br /> U r m t o L t FUNDING SOURCE INFORMATION FEDERALLY <br /> N i A.FEDERAL AID ROUTE NO. p a t e i C FEDERAL FUNDING EXPENDITURE SCHEDULE FUNDED <br /> C C o B.BRIDGE NO. r T t a n I o PROJECT MONTH/ Federal Federal RAP STATE LOCAL TOTAL (Local Agency) PROJECTS <br /> T I r C.PROJECT TITLE o y u I g i d PHASE YEAR Cost Fund CAPP FUNDS FUNDS FUNDS 4th, ENVIR. R/W <br /> N a i N D.STREET/COUNTY ROAD NAME OR NUMBER v p s t t e PHASE By Code TIA 1st 2nd 3rd 5th, TYPE REQ. <br /> L s t o E.TERMINAL BEGINNING AND END .e h y s STARTS Phase UATA 6th Y/N <br /> s y. F.DESCRIBE WORK TO BE DONE OTHER DATE <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 17 1 A.2754 05 1 C PE 8/99* EIS: <br /> B.N/A 06 P P RNV 5/2000* TIA 12000 3000 15000 750 14250 CE: <br /> C.36TH STREET P/R LOT AND ACCESS IMPROVEMENTS 12 0 CONST 3/2001' OTHER EA: DATE: <br /> D.36TH STREET,BROADWAY,41ST STREET 21 T TOTAL N/A: <br /> E.SMITH STREET TO 1-5 <br /> F.DESIGN AND CONSTRUCT P/R LOT,ACCESS IMPROV. <br /> 17 2 A.2784 04 0.8 C PE 3/96 EIS: <br /> B.N/A 06 P P RNV 10/96 CE: <br /> C.75TH STREET IMPROVEMENTS 12 0 CONST 6/97 EA: DATE: <br /> D.75TH STREET T TOTAL OTHER 1034 266 1300 1000 N/A: <br /> E.BEVERLY LANE TO BEVERLY BLVD. <br /> F.DESIGN AND CONSTRUCT ROAD WIDENING,IMPROVEMENTS <br /> 17 3 A.VARIOUS 31 0.9 C PE 4/98* EIS: <br /> B.N/A P P RM/ CE: <br /> C.COLLECTOR ARTERIAL NEEDS STUDY 0 CONST EA: DATE: <br /> D.VARIOUS LOCATIONS T TOTAL 50 50 50 N/A: <br /> E.VARIOUS LOCATIONS <br /> F.STUDY ULTIMATE COLLECTOR ARTERIAL IMPROVEMENTS <br /> 17 4 A.2795 01 0.3 C PE 11/97* EIS: <br /> B.N/A 08 P P RNV 3/98' CE: <br /> C.RIVERSIDE INDUSTRIAL PARK ACCESS BRIDGE 0 CONST 7/99' EA: DATE: <br /> D.VICINITY OF 1-5 AND E.MARINE VIEW DRIVE T TOTAL OTHER 1000 4400 5400 400 5000 N/A: <br /> E.EAST MARINE VIEW DRIVE TO SNOHOMISH RIVERFRONT <br /> F.DESIGN AND CONSTRUCT BRIDGE ACCESS TO RIVERFRONT <br /> *A portion or all of the funding for these projects has not yet been committed. <br /> NOTE:"Local Funds"include City of Everett,Snohomish County,and/or Port of Everett funds contributed or tentatively contributed to the projects. <br />