Laserfiche WebLink
SIX-YEAR TRANSPORTATION IMPROVEMENT PROGRAM,1997 TO 2002 <br /> Agency:City of Everett <br /> City No.: 0420 Hearing Date Pg 4 <br /> County No.: 31 Adoption Date <br /> MPO: PSRC MINOR ARTERIALS Resolution No. <br /> F P PROJECT IDEN I IFICAT1ON 1 SI- U PROJECT COSTS IN THOUSANDS OF DOLLARS <br /> U r m t o L t FUNDING SOURCE INFORMATION FEDERALLY <br /> N i A.FEDERAL AID ROUTE NO. p a t e i C FEDERAL FUNDING EXPENDITURE SCHEDULE FUNDED <br /> C C o B.BRIDGE NO. r T t a n I o PROJECT MONTH/ Federal Federal RAP STATE LOCAL TOTAL (Local Agency) PROJECTS <br /> T I r C.PROJECT TITLE o y u 19 i d PHASE YEAR Cost Fund CAPP FUNDS FUNDS FUNDS 4th, ENVIR. R/W <br /> N a i N D.STREET/COUNTY ROAD NAME OR NUMBER v p s t t e PHASE By Code TIA 1st 2nd 3rd 5th, TYPE REQ. <br /> L s t o E.TERMINAL BEGINNING AND END .e h y s STARTS Phase UATA 6th Y/N <br /> s y. F.DESCRIBE WORK TO BE DONE OTHER DATE <br /> 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 <br /> 16 1 A.2588 04 3.5 C PE 2/93* EIS: <br /> B.N/A 06 F P R/W 1/97* TIA 13800 2200 16000 200 4000 10000 1500 CE: <br /> C.112TH STREET IMPROVEMENTS 12 & 0 CONST 4/98* EA: DATE: <br /> D.112TH STREET S T TOTAL N/A: <br /> E.SR 527 TO SR 525 <br /> F.DESIGN AND CONSTRUCT ROAD WIDENING,IMPROVEMENTS <br /> 16 2 A.2575 04 1 �C PE 4/94 288 EIS: <br /> B.N/A 06 F P R/W 9/96 TIA 145 2612 3533 1797 CE: YES <br /> C.100TH STREET SE IMPROVEMENTS 12 0 CONST 6/98 488 EA:X DATE: <br /> D.100TH STREET SE T TOTAL 776 N/A: 9/96 <br /> E.19TH AVENUE SE TO 35TH AVENUE SE <br /> F.DESIGN AND CONSTRUCT ROAD WIDENING,IMPROVEMENTS <br /> 16 3 A.2597 05 0.5 C PE 7/96 EIS: <br /> B.N/A 06 P P R/W 5/97 2350 2350 1560 705 CE: <br /> C.4TH AVENUE WEST IMPROVEMENTS 12 0 CONST 3/98 EA: DATE: <br /> D.4TH AVENUE WEST T TOTAL N/A: <br /> E.HARDESON ROAD TO HOLLY DRIVE <br /> F.DESIGN AND CONSTRUCT ROAD WIDENING,IMPROVEMENTS <br /> 16 4 A.2781 05 2 C PE 2/98* EIS: <br /> B.N/A 06 P P R/W 9/98* 2000 350 1650 CE: <br /> C.SEAWAY BLVD.IMPROVEMENTS 12 0 CONST 5/99* EA: DATE: <br /> D.SEAWAY BLVD. T TOTAL N/A: <br /> E.75TH STREET TO 36TH STREET <br /> F.DESIGN AND CONSTRUCT ROAD WIDENING,IMPROVEMENTS <br /> 16 5 A.2584 04 '1 C PE 2/2000* EIS: <br /> B.N/A 06 P P R/W 200 5000 200 CE: <br /> C.100TH STREET SW IMPROVEMENTS 12 0 CONST EA: DATE: <br /> D.100TH STREET SW T TOTAL N/A: <br /> E.AIRPORT ROAD TO EVERGREEN WAY <br /> F.DESIGN AND CONSTRUCT ROAD WIDENING,IMPROVEMENTS <br /> *A portion or all of the funding for these projects has not yet been committed. <br /> NOTE:"Local Funds"include City of Everett,Snohomish County,and/or Port of Everett funds contributed or tentatively contributed to the projects. <br />