Laserfiche WebLink
Pl/BL/C I�t/O«5 <br /> �� <br /> ^(��� ;�� . <br /> � J � l ��J�1 <br /> V �� / <br /> U <br /> June 27, 1997 <br /> Bob Galteland <br /> Reid Middleton <br /> 19031 33rd Ave. W, si�ite 301 <br /> Lynnwood, Wash. 98036-0638 <br /> Subj: Draft Letter of Understanding ' <br /> Deaz �ir. Galteland: <br /> Thank you for the opportunity to review your draft letter of understanding for Fisherman's Boat <br /> Shop. In general, the letter accurately represents our discussions during the June 12, 1997 <br /> meeting. However, I do have a few comments: <br /> I) In second sentence of the first paragraph,change planned stormwater system to conceptual <br /> stormwater system. <br /> 2) Add"and an industrial pre-treatment permit is obtained &om the City (Jeff Kerwin is the <br /> c�ntact person at 257-8241)"to the end of item 7 on the second page. <br /> 3) Change the first sentence of item 9 on the second page to read"FBS may not proceed with <br /> construction of the system until a(1 permits have been issued and a detailed design has been <br /> approved by the City that addresses all concems expressed at the June 12, 1997 meeting and in <br /> this letter.No dischazge ;o che sewer system...". <br /> 4)Add "and occur only in dry weather"to the end of item 9 on the second page. <br /> If you have any questions regydin� my commeuts, feel free to call me at(206) 25'-�855. <br /> i cerely, <br /> �h r6�l�G�t�� <br /> Dan Mathias, P.E. <br /> Utilities Engineer <br /> C.C. Jimmy Teegarden JeffKervrin <br /> Nick Eitel, Fisherman's Boat Shop Paul McKee <br /> CITY Ol���TT•3200 Cedar Street• Everett,WA 98201 •(206) 259-8800•Fax (206) 259-8882 <br />