Laserfiche WebLink
r <br /> .r <br /> Mr. Dan Mathias <br /> � City of Everett Public Works <br /> July 7, 1997 <br /> File No. 21-97-009-001-01 <br /> Page 2 ' <br /> 2. The dischazge from the Port Gazdner Landing connection and the FBS connection <br /> will not exceed a combined total of 2.4 cubic feet per second at any time. <br /> 3. Telemetry will be installed at FBS to detect large storm events and stop dischazge to <br /> the combined sewer system during such events. <br /> 4. Telemetry will be extended to the City's Lift Station 7 to indicate when FBS is <br /> discharging stoanwater to the City's system,and automatically stop any dischazge <br /> from FBS during high-flow or inadequate pumping conditions at the Iift station. <br /> This telemetry may be triggered by Lift Station 7's fluid elevation in the wet well, <br /> start-up of secondary pumps, or other rneans acceptable to the City. <br /> 5. Remote-stop switches will be installed at Lift Station 7 so the City may remotely <br /> stop discharge from FBS during mainienance or emergency situations. <br /> 6. Calculations will be presented to the City for approval that detail the design storm <br /> event(s), on-site storage capacity, range of dischazge flows, and telemetry control <br /> elements <br /> 7. FBS has City agreement to connect this stormwater system �� the existing 10-inch <br /> sanitary sewer on the site, provided the sanitary pipe is adequately sized for the <br /> anticipated flows and an industrial pre-treatment permit is obtained from the City. <br /> Jeff Kerwin is the contact person a+.257-8241. <br /> 8. An agreement will be reached between the City and F$S allowing the City to access <br /> the FBS storm�vTter discharge system at any time to manually stop flows during any <br /> emergency con�,tion. <br /> 4. FBS may not proceed with construction of the system until all permits have been <br /> issued and a detailed design has been approved by the City that addresses all <br /> concems expressed at the June 12, 1997, meeting and in this letter. No discharge to <br /> the sewer system will be allowed until the City completes the upgrade of Lift <br /> Station 7. The Lift Station 7 upgrade i s currently planned to be completed in fall, <br /> 1998. This provision will not preclude minimal stermwater discharges necessary <br /> during construction to verify proper functioning of the system. These minimal <br /> discharges will be fully-coordinated and authorized by City staff and occur only in <br /> dry weather. <br />