Laserfiche WebLink
� _ _._ -_ _ _ ___ _ . <br />' EXHIBIT F 16 <br /> ' � D1ECE,�IBER 20, 1996 <br /> CITY OF EVERETT <br /> WATER POLLUTION CONTROL FACILITY <br /> ODOR CONTROL IMPROVEMENTS <br /> A��IENDMENf NO. 2 <br /> COLLECTION SYSTEM ODOR IMPROVEMENTS <br /> SCOPE OF WORK <br /> TASK 1 -PRELIMINARY DESIGN <br /> This task includes the preliminary desi�n of the proposed odor control improvemens for the <br /> Shadowood and Loweli Diversion Vaulu as identified in the "Everett Wastewater Collecuon <br /> System, Odor Control Evaluation" completed in November 1996. <br /> Responsibilities of Engineer <br /> 1. Develop maoping for the Shadowood and Loweil Diversion vault locations (Scale <br /> 1"=10', 1' contours). Mapping to include right-of-way limits and properry lines. <br /> 2. Develop concepmal design for the two odor control facilities including: <br /> a. Required modifications to existing vaulu <br /> b. Alignment for buried ductwork <br /> c. Locadon o;�treatment system vaults <br /> d. Configwac on of inechanicai equipment in vaults <br /> e. Altematives for dischage of�eated air <br /> f. Elecaical power supply to �eatrnent systems <br /> g. Teleme�y and instrumentation requirements <br /> h. Construction cost estimate <br /> .i. Attend public presentation for proposed improvements: <br /> �. Shadoweod Improvemenu (2 meetings) <br /> b. Lowell Diversion Vaul!Improvemenu (1 meetin;) <br /> 4. Summarize conceptual design in letter report(� pages marimum) and full size site plans <br /> for each site. <br /> 5. Meet with Ciry staff to review conceptual design. <br /> , . <br /> �2 <br /> p:1000J1.0!�tcsR01�ammd l.dx <br />