My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1222 14TH ST 2016-01-01 MF Import
>
Address Records
>
14TH ST
>
1222
>
1222 14TH ST 2016-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2017 12:12:26 PM
Creation date
4/4/2017 12:12:15 PM
Metadata
Fields
Template:
Address Document
Street Name
14TH ST
Street Number
1222
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� _ _._ -_ _ _ ___ _ . <br />' EXHIBIT F 16 <br /> ' � D1ECE,�IBER 20, 1996 <br /> CITY OF EVERETT <br /> WATER POLLUTION CONTROL FACILITY <br /> ODOR CONTROL IMPROVEMENTS <br /> A��IENDMENf NO. 2 <br /> COLLECTION SYSTEM ODOR IMPROVEMENTS <br /> SCOPE OF WORK <br /> TASK 1 -PRELIMINARY DESIGN <br /> This task includes the preliminary desi�n of the proposed odor control improvemens for the <br /> Shadowood and Loweli Diversion Vaulu as identified in the "Everett Wastewater Collecuon <br /> System, Odor Control Evaluation" completed in November 1996. <br /> Responsibilities of Engineer <br /> 1. Develop maoping for the Shadowood and Loweil Diversion vault locations (Scale <br /> 1"=10', 1' contours). Mapping to include right-of-way limits and properry lines. <br /> 2. Develop concepmal design for the two odor control facilities including: <br /> a. Required modifications to existing vaulu <br /> b. Alignment for buried ductwork <br /> c. Locadon o;�treatment system vaults <br /> d. Configwac on of inechanicai equipment in vaults <br /> e. Altematives for dischage of�eated air <br /> f. Elecaical power supply to �eatrnent systems <br /> g. Teleme�y and instrumentation requirements <br /> h. Construction cost estimate <br /> .i. Attend public presentation for proposed improvements: <br /> �. Shadoweod Improvemenu (2 meetings) <br /> b. Lowell Diversion Vaul!Improvemenu (1 meetin;) <br /> 4. Summarize conceptual design in letter report(� pages marimum) and full size site plans <br /> for each site. <br /> 5. Meet with Ciry staff to review conceptual design. <br /> , . <br /> �2 <br /> p:1000J1.0!�tcsR01�ammd l.dx <br />
The URL can be used to link to this page
Your browser does not support the video tag.