Laserfiche WebLink
• 16 <br /> Re�ponsibilities of Owaer <br /> I. Provide review commenu ou Conceptual Design Report. <br /> Task Aeliverrbies <br /> 1. Conceptual Design RepoR & copies <br /> TASK 2-FINAL DESIGN <br /> This task includes the preparauon of Contract Dar,uments for the Odor Con�ol Impmvemenu <br /> developedia Task 1. <br /> Raponsibiliries of Engineer <br /> 1. Prepare 50% review Contract Documents. <br /> 2. Specifications will utilize the City of Everett Geaeial and Special Conditions and will he <br /> based on the WSDOT/ADWP._ "1994 Standazd Specificadons for Road, Bridge and <br /> tviunicipal Construction." I <br /> 3. A preliminary li�ting of drawings is as follov;s: � <br /> Drawin¢No. Title <br /> Tide Sheet <br /> 101 Legend and Abbreviations <br /> 102 Treatment Unit No. 1 - Site Plan <br /> 103 Treatment Unit No.2-Site Plan <br /> 104 Civil Details <br /> 105 Treatment Unit No. 1 Plan and Sections <br /> 106 Treatment Unit No.2 Plan and Secrioas <br /> 107 Sections and Details <br /> ]OR Dischazge S7ucture Details <br /> 109 Miscellaneous Detai]s <br /> I 10 Elecuical Legend and Abbreviations <br /> I 1 l Elecn-ical Details <br /> 11? Elecffical Details <br /> 113 Instrumentarion Details ' <br /> 4. Submit 90% Review Contract Documents. <br /> �. Incorporate final Ciry review comments to Contract Documenu. <br /> Responsibilities of Owner <br /> p�!00011.01-lrark011ame�vll.dae <br /> 93 <br />