Laserfiche WebLink
. 1, Provide for reproduction of Contrdct Documents. <br /> 16 <br /> Task Deliverables ' <br /> 8 copies <br /> 1, Review Con[ract Documenu (50%) g co ies <br /> 2. Review Contract Documenu (90%) 1 � py +ariginals <br /> 3. Final Contract Documents 1 set <br /> 4. Full-Size Mylaz Drawings (22„x34'� <br /> TASK 3-BIDDING ASSISTAIYCE <br /> Ttris task includes the provision of bidding assistance for the proposed improvements including: <br /> I1. Attend prebid conference <br /> 2, Respond to questions dwrin8 bidding process (45 day maximum bidding period) <br /> 3, Prepaze one addendum <br /> Responsibiliries of Owner <br />�� <br /> 1, provide distribu�ion of Con�act Documentr <br />` 2 Maintain Plan Holden list <br /> 3. Make distribudo�i of any Addenda <br /> i <br /> Task Deliverables • <br /> 1. Addenda(if required) <br /> TASK 4- CONSTRUCTION ENGINEERING ASSISTANCE <br /> Responsibilities of Engineer <br /> 1. Rstimated a 30. A rota!of 120s taff hours have b e b dget d for sh p�dmwi g review. <br /> 2. Provide a maximum of 10 site visits and submit status repor[to City. <br /> 3. Respond to Ciry and Cunaactor questions oa Contract Documents. . <br /> , <br /> 94 <br /> p:1000J1.01%�r¢sk0lbm<ndl.dx <br />